  1. UL Baseball Timeline for the new Tigue

    Anyone know for sure when construction is supposed to begin? I hope it can be done before next season and we can host another regional.


  2. #2

    Default Re: Timeline for the new Tigue

    Quote Originally Posted by angellebertrand View Post
    Anyone know for sure when construction is supposed to begin? I hope it can be done before next season and we can host another regional.
    Well let me be the first to squash your hope. No major renovations will be done before next season.

  3. #3

    Default Re: Timeline for the new Tigue

    It will not be done before next season. Some renovations will be completed before next season, but the major work, replacing the grandstands, will not start until after next season.


  4. #4

    Default Re: Timeline for the new Tigue

    I would expect lighting work, dugouts, and possibly repositioning the bleachers could be done before next season. JMO


  5. #5

    Default Re: Timeline for the new Tigue

    By Farmers words they were to start after this season. It would not be completed. They would resume the construction at the end of next season. First would be the location of the lighting and the padding of the out field wall. But I will caution on the side of not holding your breath on anything being done anytime soon. If they start within the next month or so I would be elated to say the least........


  6. #6

    Default Re: Timeline for the new Tigue

    Quote Originally Posted by Frenchie35 View Post
    By Farmers words they were to start after this season. It would not be completed. They would resume the construction at the end of next season. First would be the location of the lighting and the padding of the out field wall. But I will caution on the side of not holding your breath on anything being done anytime soon. If they start within the next month or so I would be elated to say the least........
    That is consistent with what I was told and I trust my source.

  7. #7

    Default Re: Timeline for the new Tigue

    Quote Originally Posted by Frenchie35 View Post
    By Farmers words they were to start after this season. It would not be completed. They would resume the construction at the end of next season. First would be the location of the lighting and the padding of the out field wall. But I will caution on the side of not holding your breath on anything being done anytime soon. If they start within the next month or so I would be elated to say the least........
    I would be shocked. Considered the architects and UL are still fiddling with the preliminary plans I wouldn't expect to see work for months.

  8. #8

    Default Re: Timeline for the new Tigue

    Quote Originally Posted by CajunFan3406 View Post
    I would be shocked. Considered the architects and UL are still fiddling with the preliminary plans I wouldn't expect to see work for months.
    The outfield wall and lights are separate from the rest of design and thus the reason they can get done in this off season. With that said we probably will not see that for a while. We've got eight months and neither project will take anywhere close to that long.

  9. #9

    Default Re: Timeline for the new Tigue

    what are they doing to the outfield wall?


  10. #10

    Default Re: Timeline for the new Tigue

    Quote Originally Posted by mgv6260 View Post
    what are they doing to the outfield wall?
    Padded wall I believe

    The lights and wall dont need to be done the day after the season ends. Those parts of the project are shorter duration tasks that can be done once the plans are finalized

  11. #11

    Default Re: Timeline for the new Tigue

    Quote Originally Posted by Cajun90 View Post
    The outfield wall and lights are separate from the rest of design and thus the reason they can get done in this off season. With that said we probably will not see that for a while. We've got eight months and neither project will take anywhere close to that long.
    Somewhat true. The location of the light poles will impact where you can build/add on to the existing bleachers, so not necessarily separate. If you consider moving the lights as Phase 1 and the grandstand reno as Phase 2, then Phase 2 has a chance to begin after next season. The biggest part of the Phase 1 design, the stadium lighting, is at no place yet that would warrant construction in the coming months. But like you said, the project isn't an 8th month long project, so there is still time to get things done.

  12. #12

    Default Re: Timeline for the new Tigue

    Regarding the renovations to the grandstand. I assume the chairs in the grandstand will be removed and replaced with something a lot nicer that folds and has drink holders (like Lamson).

    What are the plans for the old seats that are being removed from the Tigue? I sure hope they don't end up in a dumpster. I think some fans, myself included, would be interested in getting a few (or a row) of those chairs just for the nostalgia of it. I think they could sell/auction some of those seats and give the money to the baseball team.


Page 1 of 2 1 2 LastLast

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. Escaped Inmate Timeline
    By NewsCopy in forum News Acadiana
    Replies: 0
    Last Post: June 24th, 2011, 11:50 pm
  2. Timeline for New Hire and Who's your candidate?
    By SuperCajun13 in forum Coaching Matters
    Replies: 183
    Last Post: October 30th, 2010, 08:08 am

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •