  1. #925

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Moving more "stuff" in today as they did yesterday and the day before. It takes a lot to fill up a 100,000 sf building.


  2. Default Re: Construction Cam APC ( Athletic Performance Complex )

    Saw a 18 wheeler long bed trailer unloading in one of the construction cams today.


  3. #927

    Default Re: Construction Cam APC ( Athletic Performance Complex )



  4. #928

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by Cajunologist View Post
    the visitors locker room is the single floor section under Hud's platform.
    I thought that is the film/press conference room the way the roof slants like a theater. No?

  5. #929

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by leeman View Post
    I thought that is the film/press conference room the way the roof slants like a theater. No?
    No: the large theater is close to the IPC; the visitors locker room is at the other end.

  6. #930

    Default

    Quote Originally Posted by cajuns_fan View Post
    No: the large theater is close to the IPC; the visitors locker room is at the other end.
    Gotcha. Thanks.

  7. #931

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    What is the final "move in" date set for this APC? Seems like they have been moving in a ton of pre-fab materials. I assume that they will not "complete" the outside walkways next to the Cox building until it is gone. Anyone know more information on that?


  8. #932

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by Fais do-do View Post
    What is the final "move in" date set for this APC? Seems like they have been moving in a ton of pre-fab materials. I assume that they will not "complete" the outside walkways next to the Cox building until it is gone. Anyone know more information on that?
    I heard that they will be able to occupy next week. Don't know for sure though. I think you are correct about the sidewalks etc. They will probably wait until the Cox building is demolished to finish that up. No need to have new stuff like that so close to a building that is going to be demolished.

  9. #933

    Default

    Quote Originally Posted by cajuns_fan View Post
    Not sure, but I think you are referring to the entry...which is not finished yet. Below is the pic again of what the finished product will look like.
    The entry in the picture looks great. But, this is supposed to be finished in two weeks and they haven't done anything on it yet. Hope the finished product is still to be addressed.

  10. Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by Fais do-do View Post
    What is the final "move in" date set for this APC? Seems like they have been moving in a ton of pre-fab materials. I assume that they will not "complete" the outside walkways next to the Cox building until it is gone. Anyone know more information on that?
    ---We have an off week after the N'Western game and that will be the time!!!

  11. #935

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Looks like they are working on more paving at the locker room entrance today. Moving more "stuff" in at the main entrance. They will have this job wrapped up very soon. They can move in and occupy with some loose ends but this job is heading to the finish line. They may not place the covered side walk between the Cox building and the APC until the Cox building is demolished. That will not prevent them from occupying the building.


  12. #936

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Knowing Lemoine and what they can accomplish, the walk way and covering can be finish in 4-5 days. forming and pouring concrete for them is a one day job. If they have the supplies for the covering of that walk way it can go up overnight.....that's if they have clear skies. I am taking this stance because of what I say in the south zone seating.


Page 78 of 84 FirstFirst ... 68 75 76 77 78 79 80 81 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 6 users browsing this thread. (0 members and 6 guests)

Similar Threads

  1. Replies: 0
    Last Post: January 23rd, 2013, 03:40 pm
  2. Athletic Complex Pic
    By ULtimateCajun in forum Up On LA
    Replies: 8
    Last Post: October 30th, 2009, 03:26 pm
  3. Name of Athletic Complex?
    By ulforlife in forum Up On LA
    Replies: 14
    Last Post: May 2nd, 2006, 04:26 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •