Thread: Construction Cam APC ( Athletic Performance Complex )

  1. #397

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    A bunch graduates of Northside at one time had a newsletter, called "ConCurrents", that let us know what our high school buddies were up to. ;0)


  2. #398

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Trying to get some work in today before it rains. They will probably get the roof panels on the cricket and maybe continue on. The pile of door frames is getting smaller too so that means there is progress on the partition wall framing on the first floor that we cannot see.


  3. #399

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    I don't think they will be getting much roof work done today or tomorrow.


  4. #400

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    I don't think they will be getting much roof work done today or tomorrow.
    Or this week?

  5. #401

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    I don't think they will be getting much roof work done today or tomorrow.
    In passing by Saturday on the way to Lamson it looked like most of the roof panels were up. Kind of hard to tell from Cajundome Blvd. Are they all not on? I can't see the camera view from my work computer.

  6. #402

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by BeauCajun View Post
    In passing by Saturday on the way to Lamson it looked like most of the roof panels were up. Kind of hard to tell from Cajundome Blvd. Are they all not on? I can't see the camera view from my work computer.
    Roof panels for the building adjacent to the Cox Building are on but only up to and including the cricket. That's about 25% of the building. The portion of the new building adjacent to the IPF has had the roof panels on for some time now.

  7. Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    Roof panels for the building adjacent to the Cox Building are on but only up to and including the cricket. That's about 25% of the building. The portion of the new building adjacent to the IPF has had the roof panels on for some time now.
    ---Yea the CAm show clearly how far it has come---Chirp chirp (cricket sound)---but question--If no lightning, can they work on the roof in the rain??? Can't wait to be looking at construction one day and point out a cricket!!! lol

  8. #404

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by Boomer View Post
    ---Yea the CAm show clearly how far it has come---Chirp chirp (cricket sound)---but question--If no lightning, can they work on the roof in the rain??? Can't wait to be looking at construction one day and point our a cricket!!! lol
    Not Helmut, but I would say wind is also a factor when determining if you can work on the roof.

  9. #405

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by CajunFan3406 View Post
    Not Helmut, but I would say wind is also a factor when determining if you can work on the roof.
    High wind yes, rain yes, lightning YES. Any one or combination of the three will shut them down.

  10. #406

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by CajunFan3406 View Post
    This is fairly accurate. One exception. The left wing will be women's soccer locker room and the public restrooms, along with a training room and laundry room. The right wing will be men's and women's track, along with a team lounge.

    And in case anyone was wondering. Coaches offices will be on the 2nd floor between the pressbox and Reinhardt. 5 total track offices and 3 total soccer offices. 1st floor between the towers will be as Amos described it.
    Got a few pictures from yesterday afternoon of some of the T&F construction.

  11. #407

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Great pis...thx for the update


  12. #408

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Stopped by the Complex today to pick up athletic items for auction at Houston Crawfish Boil. .....My wife and I were completely blown away by the size of the APC....the construction camera does not do the size of the place justice....this is going to be a very impressive facility


Page 34 of 84 FirstFirst ... 24 31 32 33 34 35 36 37 44 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 7 users browsing this thread. (0 members and 7 guests)

Similar Threads

  1. Replies: 0
    Last Post: January 23rd, 2013, 03:40 pm
  2. Athletic Complex Pic
    By ULtimateCajun in forum Up On LA
    Replies: 8
    Last Post: October 30th, 2009, 03:26 pm
  3. Name of Athletic Complex?
    By ulforlife in forum Up On LA
    Replies: 14
    Last Post: May 2nd, 2006, 04:26 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •