    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Seems to be very busy in the boxed-in area out of the rain.


  2. #230

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Lots of work yesterday and the beginning of today. They have completed skinning the lean to section adjacent to the IPF. They are placing the interior supports, beams and floor joist for the second floor of the APC next to the Cox building. If we had not had a week of rain last week I would suspect they would be just about finished with erecting the red steel for the building. I would suspect that within the next two weeks we will be seeing the skin go in this part of the building. Once that happens they will be out of the weather and we won't be able to see much of what is going on inside the building.


  3. #231

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    Lots of work yesterday and the beginning of today. They have completed skinning the lean to section adjacent to the IPF. They are placing the interior supports, beams and floor joist for the second floor of the APC next to the Cox building. If we had not had a week of rain last week I would suspect they would be just about finished with erecting the red steel for the building. I would suspect that within the next two weeks we will be seeing the skin go in this part of the building. Once that happens they will be out of the weather and we won't be able to see much of what is going on inside the building.
    So, there is going to be a second floor above all of the wing that faces the Cox building? That's what I thought I saw too, but if you look at the master plan there was only a very small section at the end of the wing that was going to be on the second floor, and that was designated "Coach's Offices." I know the master plan was only a scheme of what could be, but all the more reason that they should post floor plans....like they did for the student union....so we can know what is going where.

  4. #232

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    More good work these past few days. Looks like they are starting to put the metal deck pan on the second floor. It appears that they are concentrating on getting a portion of the building ready for plumbing, electrical and mechanical rough in. They will then continue with red steel erection after they finish with the metal decking. They will then place the light weight concrete on the second floor. Not a bad plan.


  5. #233

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Does anyone know the décor of the outside of the building? Did they skimp or will it be something eye-catching?


  6. #234

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    [QUOTE=DaddyCajun;799987]Does anyone know the décor of the outside of the building? Did they skimp or will it be something eye-catching?

    It will not look like the original master plan video that we have seen in the past. I am sure that money came into play.....


  7. #235

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    I heard August completion, is that right or possible?


  8. #236

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by Frenchie35 View Post
    I heard August completion, is that right or possible?
    I know the goal is to have them in by football season. I'm not in construction, but I'd imagine once they get the exterior up they can work pretty quickly and continuously on the inside.

  9. #237

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Pretty sure Sept 1 has been the due date, don't think it's changed. Also, I'm pretty sure the exterior will still look like the picture I posted a page back


  10. #238

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    How about 400 yards of bricks, 10 feet up from the ground.

    I'm not sure about the circumference of the APC. I bet 400 yards, or 1200 feet would be a good guess. 10 feet off the ground would look good IMO.
    It looks like around $138,000 bucks, a substantial amount of that is labor costs.
    Bricking the entire building from ground up would probably cost 3X that.

    Do the math yourself if you want.

    http://www.brick.com/products/kingsize.htm

    copy and paste this, it's a brick/square foot calculator. University or Burgundy brown would look nice.

    Put me in for a $2000. ---just a thought.
    Here's another fun "build your own brick building" link. Copy/paste

    http://www.accurateimage.com/designo...?zipcode=70507


  11. #239

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    We won't be seeing the rear portion of the new building for long. The steel is going up on the front portion of the building and blocking the view.


  12. #240

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    This is the old plan (level 1 & 2)that does not match up with the building. Anyone have the new floor plans?

    Attached Images Attached Images    

Page 20 of 84 FirstFirst ... 10 17 18 19 20 21 22 23 30 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 11 users browsing this thread. (0 members and 11 guests)

Similar Threads

  1. Replies: 0
    Last Post: January 23rd, 2013, 03:40 pm
  2. Athletic Complex Pic
    By ULtimateCajun in forum Up On LA
    Replies: 8
    Last Post: October 30th, 2009, 03:26 pm
  3. Name of Athletic Complex?
    By ulforlife in forum Up On LA
    Replies: 14
    Last Post: May 2nd, 2006, 04:26 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •