  1. #937

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Yeah, they already framed up the sidewalk along Reinhart Dr. I would think they are will at least pour the sidewalk in between the cox building and the APC now, even it they don't do the over head. Otherwise they will be traversing through mud just to get in and out of the main entrance.


  2. #938

    Default

    Quote Originally Posted by HelmutVII View Post
    Looks like they are working on more paving at the locker room entrance today. Moving more "stuff" in at the main entrance. They will have this job wrapped up very soon. They can move in and occupy with some loose ends but this job is heading to the finish line. They may not place the covered side walk between the Cox building and the APC until the Cox building is demolished. That will not prevent them from occupying the building.
    When will the Cox building be demolished? When will they finish the entrance?

  3. #939

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HoustonCajun View Post
    When will the Cox building be demolished? When will they finish the entrance?
    Right now, that is low priority, as it is not on the critical path for occupancy. They need to complete all things necessary for them to occupy in a couple of weeks. That is life safety code, fire alarm, plumbing, mechanical and ADA issues etc. I mentioned in my previous post that they may not have the covered walk done prior to occupancy. I figured some would freak out if it wasn't done. I say, why care, they are occupying the building. After all that's why they built it. The covered walk can happen any time, UNLESS, they have to place the sidewalk if it's considered a means of egress for fire or a necessary handicapped exit. It depends on how they presented the plans to the Fire Marshal and (more importantly) how the Fire Marshal approved it. The Fire Marshal enforces the code and it is not subject to variance. They can and do delay occupancy. They can and do condemn buildings and they can and do levy fines and if necessary arrest and jail. They are an arm of the Department of Corrections, they carry badges, fire arms and hand cuffs. You really don't want to mess with the Fire Marshal. After the owner, the Fire Marshal is the number one guy to satisfy.

  4. #940

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    Right now, that is low priority, as it is not on the critical path for occupancy. They need to complete all things necessary for them to occupy in a couple of weeks. That is life safety code, fire alarm, plumbing, mechanical and ADA issues etc. I mentioned in my previous post that they may not have the covered walk done prior to occupancy. I figured some would freak out if it wasn't done. I say, why care, they are occupying the building. After all that's why they built it. The covered walk can happen any time, UNLESS, they have to place the sidewalk if it's considered a means of egress for fire or a necessary handicapped exit. It depends on how they presented the plans to the Fire Marshal and (more importantly) how the Fire Marshal approved it. The Fire Marshal enforces the code and it is not subject to variance. They can and do delay occupancy. They can and do condemn buildings and they can and do levy fines and if necessary arrest and jail. They are an arm of the Department of Corrections, they carry badges, fire arms and hand cuffs. You really don't want to mess with the Fire Marshal. After the owner, the Fire Marshal is the number one guy to satisfy.
    Is the entrance finished or will it be finished in the next week or so to match the picture that was posted?

  5. Default APC

    I'm a little worried the move into the APC will distract players and at the start of the season.

    I wish this had been finished a month ago.


  6. Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HoustonCajun View Post
    He was answering my question regarding the Cox demolition and talked about a covered walk that could be completed later. Didn't say anything regarding my other question, which is why I asked. Seems to me finishing the main entrance to a building would be a priority to be completed.
    ---Was by there a couple of days ago---the brick columns look great---should have taken a photo and maybe Java woman could have put it on here!!! Just looking at the IPF, you can see the brick that surrounds it---think with the landscaping and signage and some brick enhancements that this thing will really be a very top quality looking outside to go with the fabulous inside area!!!

  7. #943

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HoustonCajun View Post
    Is the entrance finished or will it be finished in the next week or so to match the picture that was posted?
    Sigh. The entrance is not finished cosmetically. THE NUMBER ONE ISSUE RIGHT NOW IS TO GET THE BUILDING TO OCCUPANCY STANDARDS!!!!! That is, to satisfy all life safety issues. The only thing about the entrance that is on that list right now is meeting fire and ADA egress standards. The skin on the entrance CAN BE DONE ANY TIME AFTER OCCUPANCY. I am sure it is part of the contract and the contract will not be closed out until it is done. They didn't spend 14 million dollars on a building to look at it, they spent 14 million dollars on the building TO USE THE DAMN THING. NUMBER ONE GOAL RIGHT NOW IS OCCUPANCY. The fire marshal and any other safety or building inspector really doesn't care how the building looks they just are concerned that all the codes are met.

    OH YEAH I NEED TO MENTION THIS, THE NUMBER ONE ISSUE RIGHT NOW IS OCCUPANCY.

  8. Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    Sigh. The entrance is not finished cosmetically. THE NUMBER ONE ISSUE RIGHT NOW IS TO GET THE BUILDING TO OCCUPANCY STANDARDS!!!!! That is, to satisfy all life safety issues. The only thing about the entrance that is on that list right now is meeting fire and ADA egress standards. The skin on the entrance CAN BE DONE ANY TIME AFTER OCCUPANCY. I am sure it is part of the contract and the contract will not be closed out until it is done. They didn't spend 14 million dollars on a building to look at it, they spent 14 million dollars on the building TO USE THE DAMN THING. NUMBER ONE GOAL RIGHT NOW IS OCCUPANCY. The fire marshal and any other safety or building inspector really doesn't care how the building looks they just are concerned that all the codes are met.

    OH YEAH I NEED TO MENTION THIS, THE NUMBER ONE ISSUE RIGHT NOW IS OCCUPANCY.
    ----Yea the building has not been handed over so they are working with different stuff like the weights coming in with some wall areas not totally complete!!!

  9. #945

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Quote Originally Posted by HelmutVII View Post
    Sigh. The entrance is not finished cosmetically. THE NUMBER ONE ISSUE RIGHT NOW IS TO GET THE BUILDING TO OCCUPANCY STANDARDS!!!!! That is, to satisfy all life safety issues. The only thing about the entrance that is on that list right now is meeting fire and ADA egress standards. The skin on the entrance CAN BE DONE ANY TIME AFTER OCCUPANCY. I am sure it is part of the contract and the contract will not be closed out until it is done. They didn't spend 14 million dollars on a building to look at it, they spent 14 million dollars on the building TO USE THE DAMN THING. NUMBER ONE GOAL RIGHT NOW IS OCCUPANCY. The fire marshal and any other safety or building inspector really doesn't care how the building looks they just are concerned that all the codes are met.

    OH YEAH I NEED TO MENTION THIS, THE NUMBER ONE ISSUE RIGHT NOW IS OCCUPANCY.
    THANK YOU. Just wanted to know what the finished product will ultimately look like.

  10. #946

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    The move in date for the Track & Field complex is Sep 21st. As of right now they just have to wrap up some painting and other minor interior finishes.


  11. #947
    RedCajun's Avatar RedCajun is offline Ragin Cajuns of Louisiana Ragin' Cajuns Fan for Sure

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    Wow, just gonna leave this here


    [IMG]

    [/IMG]

    [IMG] [/IMG]

  12. #948

    Default Re: Construction Cam APC ( Athletic Performance Complex )

    I read UL put in the biggest order ever in the history of the company providing the lifing equipment.


Page 79 of 84 FirstFirst ... 69 76 77 78 79 80 81 82 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 4 users browsing this thread. (0 members and 4 guests)

Similar Threads

  1. Replies: 0
    Last Post: January 23rd, 2013, 03:40 pm
  2. Athletic Complex Pic
    By ULtimateCajun in forum Up On LA
    Replies: 8
    Last Post: October 30th, 2009, 03:26 pm
  3. Name of Athletic Complex?
    By ulforlife in forum Up On LA
    Replies: 14
    Last Post: May 2nd, 2006, 04:26 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •