  1. #331

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by cajun4life View Post
    Are you dense? Or just not paying attention? Either way, visiting locker rooms/concessions/restrooms are going to be constructed along with the seating that is currently going up now.
    I thought the lockers room additions were specified as part of phase II. If it's phase I, please remove that comment. It doesn't change the issue with the weight room.

  2. #332

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by cajun4life View Post
    Move the weight room to the Gym inside the IPF and have basketball practice in Bourgeous Hall again like they use to do.
    Nope.

  3. #333

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by RedBug58 View Post
    Looks like that open area will get bigger and bigger as they move up. Surely there are plans to do something there. Thanks for the pics!!
    They will put seating there. They will do that after they reach the top of the stadium with the seating they are installing now. All of the other seating is modular and the forms are consistent. This area is not modular and each row will have to have forms cut to fit. They do not want to do this until they are finished with the forms they are using now. It would slow them up too much.

  4. #334

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by Frenchie35 View Post
    Why This:




    Because of This:

    Because the "this" you are seeing is not the end result of why they pulled up the parking. I would suspect that there will be much more happening here. The Blue paint mark on the ground marks a water line that they need to know the location of because they will be digging there to install some more utilities or drainage.

  5. Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by CajunAmos View Post
    I thought the lockers room additions were specified as part of phase II. If it's phase I, please remove that comment. It doesn't change the issue with the weight room.
    The Basketball wing of the IPF will become the new weight room.

    This is perfect because it couldn't hold a regulation basketball court but will make for a huge climate controlled weight room.

  6. #336

    Default Re: Construction, 5/12/2014 @ 11 AM

    I'm just very excited to see the new sections of end zone seats be to this point. It definitely appears that those seats will be ready to host people for the start of the season. Does anyone know what our capacity is supposed to be when those seats are completed? We are going to have record attendance this season. Like huge record attendance.


  7. #337

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by Bandwagon King View Post
    I'm just very excited to see the new sections of end zone seats be to this point. It definitely appears that those seats will be ready to host people for the start of the season. Does anyone know what our capacity is supposed to be when those seats are completed? We are going to have record attendance this season. Like huge record attendance.
    Yep. I don't know the number, but if we can avoid bad weather this season, we're going to average close to 40,000 this year. My official prediction.

  8. #338

    Default Re: Construction, 5/12/2014 @ 11 AM

    One more time: This is from head engineer on site.......(1) All, I say all the seating and concession and restroom in the south end zone will be complete by August 30, 2014. (2) The SAC is part of Phase I and will be started after the end zone and concession and restrooms are completed as well as the weight room in the indoor Basket ball area. (3) When the SAC and weight area is completed and ready to move in the Cox building will be torn down. This is all phase I.......now this could all be change for what ever reason. But this is what I was told sitting in the contractor trailer about two week ago.......I am no engineer and all I done was listen to what he said.......


  9. #339
    RedCajun's Avatar RedCajun is offline Ragin Cajuns of Louisiana Ragin' Cajuns Fan for Sure

    Default

    Quote Originally Posted by Frenchie35 View Post
    One more time: This is from head engineer on site.......(1) All, I say all the seating and concession and restroom in the south end zone will be complete by August 30, 2014. (2) The SAC is part of Phase I and will be started after the end zone and concession and restrooms are completed as well as the weight room in the indoor Basket ball area. (3) When the SAC and weight area is completed and ready to move in the Cox building will be torn down. This is all phase I.......now this could all be change for what ever reason. But this is what I was told sitting in the contractor trailer about two week ago.......I am no engineer and all I done was listen to what he said.......
    Thank you sir

  10. #340

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by Turbine View Post
    The Basketball wing of the IPF will become the new weight room.

    This is perfect because it couldn't hold a regulation basketball court but will make for a huge climate controlled weight room.
    Actually, I thought that was part of a phase III plan. I thought they would do that once they built another basketball practice facility in the eastern part of the Cajun Field parking lot.

  11. #341

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by Frenchie35 View Post
    One more time: This is from head engineer on site.......(1) All, I say all the seating and concession and restroom in the south end zone will be complete by August 30, 2014. (2) The SAC is part of Phase I and will be started after the end zone and concession and restrooms are completed as well as the weight room in the indoor Basket ball area. (3) When the SAC and weight area is completed and ready to move in the Cox building will be torn down. This is all phase I.......now this could all be change for what ever reason. But this is what I was told sitting in the contractor trailer about two week ago.......I am no engineer and all I done was listen to what he said.......
    I believe!

  12. #342
    RedCajun's Avatar RedCajun is offline Ragin Cajuns of Louisiana Ragin' Cajuns Fan for Sure

    Default

    Quote Originally Posted by CajunAmos View Post
    Actually, I thought that was part of a phase III plan. I thought they would do that once they built another basketball practice facility in the eastern part of the Cajun Field parking lot.
    I think the current basketball area is supposed to be a "secondary" weight room, right?

  13. #343

    Default Re: Construction, 5/12/2014 @ 11 AM

    I found the following on the University Website, but even it seems to have some items that aren't defined.

    http://www.ragincajuns.com/news/2013...321130443.aspx

    LAFAYETTE, La. -- Nine projects that total $115 million and will serve as a blue print for the success and growth of intercollegiate athletics at the University of Louisiana at Lafayette for decades to come, highlight the Athletics Facilities Master Plan. The plan was announced at a press conference on Thursday morning at the Alumni House on the Louisiana campus by University President Dr. Joseph Savoie, Director of Athletics Scott Farmer and 360 Architecture Principal Architect Nate Appleman.

    The plan culminates a process that has examined the current and future needs of intercollegiate athletics.

    “Our goal is to have the facilities to allow the Ragin’ Cajuns athletic programs to continue to grow and compete against the nation’s best,” Farmer said.

    “This project should be the most important thing that the Athletics Department has done in 50 years related to facilities,” Farmer added.

    “The University’s Ragin’ Cajuns sports complex will be transformed into a more vibrant space that will greatly improve fans’ experiences, provide a wonderful resource to the larger community, and most importantly, raise the level of our athletics teams’ ability to recruit and compete,” Dr. Savoie said.

    The list of projects has been broken into three tiers, or levels of priority.

    The top tier of facility priorities include improvements to the soccer and track facility, seating and amenity expansion in the south end of Cajun Field, and the new Athletics Practice Facility which will be built adjacent to the Leon Moncla Indoor Practice Facility and the football practice fields.

    ”It is our plan to take these three projects to the UL System Board meeting in April for their approval, with a shovel going in the ground this summer,” Farmer said.

    The second tier of facility priorities include the remaining proposed improvements to Cajun Field and the renovation and expansion of M.L. “Tigue” Moore Field.

    “These are two of the most expensive projects in the plan and it is our intention to start the process of finding design detail architects for both jobs in the coming months and determine a construction schedule so that we can implement them once all of the finances are arranged,” Farmer said.

    The final tier of improvements include a new sports plaza behind the south end of Cajun Field, renovation of the Academic Center, proposed improvements at Earl K. Long Gym and the Culotta Tennis Center and a new basketball practice facility.

    “Each of these are stand-alone projects that we can build at any time without affecting the other projects in the plan. It is our intention to begin each once the funding becomes available,” Farmer added.

    “For the Athletics Facilities Master Plan to be a success, it will take a lot of work and support from all levels of the Ragin’ Cajuns support base,” Farmer said.

    “The athletic budget has seen record increases over the last few years because of the generosity of our fans and supporters. It is important that we raise the money for the Athletics Facilities Master Plan without stunting the annual growth of the operating budget.

    “The last several years has featured record-setting financial support from our fans, donors and corporate sponsors. I am asking everyone for even more help down the road.

    “To paraphrase Coach Hudspeth, the Ragin’ Cajuns need all of our fans and supporters to grab hold of the rope and pull hard so the department can move forward and complete all of these projects,” Farmer added.

    Here is a synopsis of the projects included in the Master Athletic Facilities Plan:

    Renovation of Cajun Field
    • Five construction phases that could ultimately raise capacity to over 65,000.

    • The first step of the first phase is to add 5,900 seats to south end zone, allowing for the remaining expansion to be done without losing use of Cajun Field or playing a season with a diminished capacity.

    • The main phase will feature the addition of a structure on the west side that will include 23,500 square feet of office space for the athletic administration, 1,200 club seats, 128 loge seats and 37 box suites. It will replace the current press box and include either changes or replacement of the current upper deck seating.

    • Also included in the main phase is an upper level of seating on the east sideline, adding 9,546 seats that will bring capacity to 50,000.

    Athletics Practice Facility
    Located adjacent to the Leon Moncla Indoor Practice Facility and on some of the space currently being used for the football practice fields, the 71,000 square foot facility will create new space for athletic training, equipment and strength and conditioning and house the offices for the football program.

    Football Amenities In The APF (24,000 square feet)
    • Includes office space for head coach, assistant coaches and administrative and support staff.

    • 4,800 square feet of meeting space, including a main auditorium that seats 130-150 people that can be broken down into multiple meeting rooms.

    • Video editing suite and storage facilities that include video distribution and viewing areas for pro scouts.

    • Locker room facilities for the football team, coaching staff and visitors.

    Athletic Training In The APF (10,000 square feet)
    • Includes office space for athletic training staff, doctor’s office and exam room, a hydro-therapy room along with 3,500 square feet dedicated to treatment and rehabilitation.

    Equipment Room In The APF (5,700 sf)
    Almost 6,000 square feet of space located off the loading dock and receiving area that includes work space, offices for the full-time staff, expanded laundry facility, issue bins and equipment storage.

    Strength and Conditioning In The APF (18,800 sf)
    • Multiple weight room facilities that will allow more student-athletes to work out at the same time along with a common nutrition station.

    • Primary facility covers 12,000 square feet which will handle student-athletes simultaneously, including space for agility, plyometrics and warm-ups.

    • Current basketball court attached to indoor facility will be re-purposed into a 5,000 square foot secondary weight room.

    • Cardio mezzanine connects the two facilities, sharing space with athletic training for use rehabbing and evaluation of injuries.

    Track & Soccer Facility
    • The current complex that serves as the home of the Cajuns men’s and women’s track teams and the women’s soccer squad will get a face lift.

    • Individual office space for each coaching staff.

    • Individual locker rooms for each team will be either renovated or built.

    Student-Athlete Academic Center
    Covering 10,700 square feet of space, the space will provide a centralized location for all academic support. The center includes office space for the academic support staff, computer lab, classroom with theatre-style seating for 50, a primary study lounge with 12 private tutoring labs and a pair of medium-size tutor labs.

    M.L. “Tigue” Moore Field
    The home of Ragin’ Cajuns baseball since 1978 will get a major renovation, increasing capacity to approximately 4,500 with at least 1,200 chair back seats. Additional improvements include:

    • Nine luxury suites capable of holding 10 fans each.

    • 1,500 square foot press box that includes two radio booths, a television booth and increased space for game management.

    • Renovated baseball offices and locker rooms, adding a player’s lounge and meeting rooms.

    Basketball Practice Facility
    Currently slated to be built on the southwest corner of Cajundome Blvd & Reinhardt, the 32,000 square foot structure will house the Louisiana men’s and women’s basketball teams. It will include:

    • Basketball practice area that includes a regulation basketball court and several side baskets.

    • Locker rooms for the team and coaching staff.

    • Satellite Athletic Training room (1,200).

    • Shared film room and video editing space.

    Earl K. Long Gym
    Opened in 1939, currently serving as the home of women’s basketball and volleyball, historic Earl K. Long Gym will get a face lift. Renovating the existing space will project a more modern look.

    Culotta Tennis Center
    One of the newest athletic facilities, Culotta Tennis Center will get an update, building expanded locker room and office space, increasing outdoor lighting and creating a four-court indoor facility added to allow year-round practice and playing.

    Golf Practice Facility
    At a site to be determined in the near future, office and locker room facilities will be built to allow the Ragin’ Cajuns a place to call home throughout the year.

    Sports Plaza
    Once the structure is finished on the west side of Cajun Field is completed, plans call for the Cox Communications Athletic Center to be demolished, opening up nearly four acres of space for the Sports Plaza.

    The plaza will be a gathering point for activities in Cajun Field, the Culotta Tennis Center, M.L. "Tigue" Moore Field and Lamson Park, providing space where fans can gather and share the immense culture that Ragin’ Cajuns athletics enjoys.


  14. #344

    Default Re: Construction, 5/12/2014 @ 11 AM

    Quote Originally Posted by Bandwagon King View Post
    I'm just very excited to see the new sections of end zone seats be to this point. It definitely appears that those seats will be ready to host people for the start of the season. Does anyone know what our capacity is supposed to be when those seats are completed? We are going to have record attendance this season. Like huge record attendance.
    Coming in at 36,904 capacity

  15. #345

    Default Re: Construction, 5/12/2014 @ 11 AM

    Does anyone know how season ticket sales are doing this season? They need to put a major ticket drive together with a major marketing blitz for the whole athletic department for next season.


Page 23 of 63 FirstFirst ... 13 20 21 22 23 24 25 26 33 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 13 users browsing this thread. (0 members and 13 guests)

Similar Threads

  1. Getting Closer
    By CajunDreDog in forum Football
    Replies: 6
    Last Post: August 29th, 2015, 08:21 pm
  2. Astros no closer to naming a closer
    By NewsCopy in forum Sports Mantle
    Replies: 1
    Last Post: August 1st, 2012, 11:49 pm