Page 19 of 78 FirstFirst ... 9 16 17 18 19 20 21 22 29 ... LastLast
Results 217 to 228 of 935

Thread: A little closer view.......

  1. #217
    RedCajun's Avatar RedCajun is offline Ragin Cajuns of Louisiana Ragin' Cajuns Fan for Sure

    Default

    Quote Originally Posted by cajuns_fan View Post
    Not sure what 'IPF' stands for......is that the same thing as the 'APF' ( athletic performance center)? And I wonder if the Cox center will demolished directly after the APF is finished, along with Reinhardt Dr being straightened out? One last question: is the construction on the sports plaza included in Tier One? Thanks.....
    Supposedly, the cox center won't be demolished until the upper deck project in phase 2 is completed. The back side of the upper deck will house the athletic director and support staff, etc offices

  2. #218

    Default Re: Construction 4/29/2014 @12 noon

    Quote Originally Posted by cajuns_fan View Post
    Not sure what 'IPF' stands for......is that the same thing as the 'APF' ( athletic performance center)? And I wonder if the Cox center will demolished directly after the APF is finished, along with Reinhardt Dr being straightened out? One last question: is the construction on the sports plaza included in Tier One? Thanks.....
    BTW, FWIW the APF will join with the IPF, but DBEYR because FWIW IMHO the admin is STID. WEG

  3. Default Re: Construction 4/29/2014 @12 noon

    Quote Originally Posted by CajunAmos View Post
    BTW, FWIW the APF will join with the IPF, but DBEYR because FWIW IMHO the admin is STID. WEG
    Here is what I gathered: "the will join with the, but because the admin is."

    So it's the admins fault huh?

  4. #220

    Default Re: Construction 4/29/2014 @12 noon

    Quote Originally Posted by RedCajun View Post
    Supposedly, the cox center won't be demolished until the upper deck project in phase 2 is completed. The back side of the upper deck will house the athletic director and support staff, etc offices
    While taking pictures I talked to the engineer on site and this is what he told me. After they finish pouring the cement steps they will start installing the seats. While doing that they will start on the concession and restroom in the end zone. All this is to be completed by Aug. 30.....when that is done they will start on the Athletic Performance Center. All of this is in phase one........That is what I was told by someone that should know what the hell is being done.........And by the way I was in the trailer looking at the plans while speaking to him......wish I had taken pictures of the plans.....

  5. #221

    Default Re: Construction 4/29/2014 @12 noon

    Quote Originally Posted by Frenchie35 View Post
    While taking pictures I talked to the engineer on site and this is what he told me. After they finish pouring the cement steps they will start installing the seats. While doing that they will start on the concession and restroom in the end zone. All this is to be completed by Aug. 30.....when that is done they will start on the Athletic Performance Center. All of this is in phase one........That is what I was told by someone that should know what the hell is being done.........And by the way I was in the trailer looking at the plans while speaking to him......wish I had taken pictures of the plans.....
    Can you please try to explain the plans?



    Thanks for all of the info!

  6. #222

    Default Re: Construction 4/29/2014 @12 noon

    Two lsu walk-on........





    lsu QB walk-on



  7. #223

    Default Re: Construction 4/29/2014 @12 noon

    Quote Originally Posted by Frenchie35 View Post
    While taking pictures I talked to the engineer on site and this is what he told me. After they finish pouring the cement steps they will start installing the seats. While doing that they will start on the concession and restroom in the end zone. All this is to be completed by Aug. 30.....when that is done they will start on the Athletic Performance Center. All of this is in phase one........That is what I was told by someone that should know what the hell is being done.........And by the way I was in the trailer looking at the plans while speaking to him......wish I had taken pictures of the plans.....
    I thought the goal for the APC is to be completed for the start of football 2015. If they don't start on this until Sept. 1, 2014, can they get it completed in 1 year? Why do they have to wait until after Aug. 30 to start work on the APC? Why not start now?

  8. #224

    Default Re: Construction 4/29/2014 @12 noon

    Don't know the answer to that, but if I know contractors, The can get it down in one year....what they done on the campus was just amazing. One day they were bring down the old and the next going up with the new......after talking to the on site boss I could tell that he had everything in a row and knew what he was doing.....


  9. #225

    Default Re: Construction 4/29/2014 @12 noon

    Quote Originally Posted by Frenchie35 View Post
    Two lsu walk-on........





    lsu QB walk-on


    hahaha

  10. #226

    Ragin' Cajuns Alert: Cajun Field Cam frozen on Wed. April 30th

    Camera frozen, Wed @ 3:09 PM......hell they could be finish and we wouldn't know.......


  11. #227

    Default Construction 5/2/2014 @ 11 AM

    They are pouring cement bulk heads every 10 seat sections for support.....











    Preparing for concession and restroom area......



  12. #228

    Default Re: Construction 5/2/2014 @ 11 AM

    helmut,

    what are those rebar going to tie into that are coming off the wall at the end of the seating section? i cant imagine that is post tention?


Page 19 of 78 FirstFirst ... 9 16 17 18 19 20 21 22 29 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 9 users browsing this thread. (0 members and 9 guests)

Similar Threads

  1. Getting Closer
    By CajunDreDog in forum Football
    Replies: 6
    Last Post: August 29th, 2015, 08:21 pm
  2. Astros no closer to naming a closer
    By NewsCopy in forum Sports Mantle
    Replies: 1
    Last Post: August 1st, 2012, 11:49 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •