This may be a little technical engineering talk, but the purpose of the trench is to put stuff. I have never seen anyone dig a trench without then putting something in it. Watch, you'll see!
This may be a little technical engineering talk, but the purpose of the trench is to put stuff. I have never seen anyone dig a trench without then putting something in it. Watch, you'll see!
Correct, even if they put the stuff they dug out of it right back in it......just so it's stuff....
Looks good so far! Does anyone know the May start date of the IPF Tier 1 70,000 sqft addition?
Think it's a French drain.
Not sure what 'IPF' stands for......is that the same thing as the 'APF' ( athletic performance center)? And I wonder if the Cox center will demolished directly after the APF is finished, along with Reinhardt Dr being straightened out? One last question: is the construction on the sports plaza included in Tier One? Thanks.....
While taking pictures I talked to the engineer on site and this is what he told me. After they finish pouring the cement steps they will start installing the seats. While doing that they will start on the concession and restroom in the end zone. All this is to be completed by Aug. 30.....when that is done they will start on the Athletic Performance Center. All of this is in phase one........That is what I was told by someone that should know what the hell is being done.........And by the way I was in the trailer looking at the plans while speaking to him......wish I had taken pictures of the plans.....
Don't know the answer to that, but if I know contractors, The can get it down in one year....what they done on the campus was just amazing. One day they were bring down the old and the next going up with the new......after talking to the on site boss I could tell that he had everything in a row and knew what he was doing.....
There are currently 14 users browsing this thread. (0 members and 14 guests)