I don't know if it's still the case but I was told there would be an actual bell in there to ring after touchdowns.
I don't know if it's still the case but I was told there would be an actual bell in there to ring after touchdowns.
Hells Bells! Play the song by AC/DC every time we make the opponent punt or sack their QB
Went by the construction site. Not much to report and take pictures of. Seem like they are just starting to brick the columns on the building by gate A. Looks like they are about finish bricking the building by gate A. No seats being installed as of yet. The score board still looks like it did last week. I am thinking they might put the video screen in the existing structure. No one there to ask. What was the size of the video screen to be installed? All that being said, the work crews same to be moving a little bit slower. The end of August is coming real fast. 46 days and counting.
The video screen is the size of the overall size of the prior board with sponsor sections. It will fit on the existing columns.
Any specs on the new sound system?
My question is, will the new video screen be placed into the existing frame work or boxed in area of the old score board you see here? Or will this whole score board be taken down to the columns and a new one be set on top of it. The new video board is 30 X 54, so I will assume that the old board will except a 30 X 54 video screen......
http://i209.photobucket.com/albums/b...rn35/012-6.jpg
Not to be picky but I hope the sign on the top goes away. I don't like the mix of upper case and lower case lettering.
RAGIN CAJUNS all in bold upper case would be nice.
There are currently 1 users browsing this thread. (0 members and 1 guests)