Page 19 of 63 FirstFirst . 9 16 17 18 19 20 21 22 29 . LastLast
Results 271 to 285 of 935

Thread: A little closer view.

  1. #271

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Here's a couple of photo's of the rest room and concession area being readied.





  2. #272

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Also has anyone notice the flat bed trucks at Blackham? The have several trucks with cement prefab sections on them. Just wondering if that's for the concession and restroom behind the south end zone. Don't know of any other construction going on that it might be for.


  3. #273

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by Frenchie35 View Post
    Here's a couple of photo's of the rest room and concession area being readied.






    Love that Frenchie Cam! It doesn't seem to freez up.

  4. #274

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by Frenchie35 View Post
    Also has anyone notice the flat bed trucks at Blackham? The have several trucks with cement prefab sections on them. Just wondering if that's for the concession and restroom behind the south end zone. Don't know of any other construction going on that it might be for.
    i think it is for the parking garage structures, but that is a guess

  5. #275

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by dms4720 View Post
    anyone know why they are stopping three feet from the student side instead of running all the way into that wall?
    Walkway. Might also be making room for handicap-accessible seating higher up (2-3 seats per row with lots of room).

  6. #276

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by ulforlife View Post
    They should paint it to match the concrete and then paint a RAGIN CAJUNS logo over it or something. I sure hope they don't do something really cheesy and get a large tarp screen printed with a blown up picture of fans cheering in some attempt to camouflage it (yikes).
    With our inept marketing skills, it will probably be a big fat yellow pepper.

  7. #277

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by Turbine View Post
    Looked like a walkway at first glance.

    I wonder why they skipped a row? I can see where they will come back to it.
    When they placed the bulk head they skipped three rows. They did that to construct the bulk head. The bulk head is used to stiffen the bulkhead and to key it into the ground. It's all good there will be now rows skipped or accommodations for handicapped because that location is not accessible by ADA standards.

  8. #278

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by dms4720 View Post
    i think it is for the parking garage structures, but that is a guess
    You aree correct it is a staging location for precast, pre tensioned concrete members for the parking garage.

  9. #279

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by dms4720 View Post
    anyone know why they are stopping three feet from the student side instead of running all the way into that wall?
    It is a transition zone between the old portion of the stadium (old codes) and the new portion of the stadium (new codes). The codes for stadium slopes have changed and they will not match at any location except the bottom. I am thinking there will be no seats nor will there be any access at these locations. The code writers review changes, adopt the changes and the local municipalities and states adopt the code. There are no variances for code enforcement. The code is the code.

  10. #280

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by HelmutVII View Post
    It is a transition zone between the old portion of the stadium (old codes) and the new portion of the stadium (new codes). The codes for stadium slopes have changed and they will not match at any location except the bottom. I am thinking there will be no seats nor will there be any access at these locations. The code writers review changes, adopt the changes and the local municipalities and states adopt the code. There are no variances for code enforcement. The code is the code.
    i hope this helps to clarify my question.

    whats going where the black arrows are??

    the new bulkhead on the home side which is next to the existing bulkhead is at a completely different slope, thats the only reason im asking.
    Attached Images Attached Images  

  11. #281

    Default Re: Why is the Construction Cam Stuck on April 30th?

    Why can't we have a camera that plays live instead of every 15 seconds


  12. #282

    Default Re: Construction 5/5/2014 @ 1:30 PM

    New place for kids to slide?


  13. #283

    Default

    Quote Originally Posted by anhil8tor View Post
    Why can't we have a camera that plays live instead of every 15 seconds
    Come on man!! That's not the way we do things here!

  14. #284

    Default Re: Alert: Cajun Field Cam frozen on Wed. April 30th

    I tried yelling at the computer screen, I don't know what else to do.


  15. #285

    Default Re: Construction 5/5/2014 @ 1:30 PM

    Quote Originally Posted by wcd35 View Post
    New place for kids to slide?
    Lol'd

Page 19 of 63 FirstFirst . 9 16 17 18 19 20 21 22 29 . LastLast

Thread Information

Users Browsing this Thread

There are currently 24 users browsing this thread. (0 members and 24 guests)

Similar Threads

  1. Getting Closer
    By CajunDreDog in forum Football
    Replies: 6
    Last Post: August 29th, 2015, 08:21 pm
  2. Astros no closer to naming a closer
    By NewsCopy in forum Sports Mantle
    Replies: 1
    Last Post: August 1st, 2012, 11:49 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •