Page 9 of 45 FirstFirst ... 6 7 8 9 10 11 12 19 ... LastLast
Results 97 to 108 of 531

Thread: Is that a construction cam?

  1. #97

    Default Re: Is that a construction cam?

    Quote Originally Posted by Fais do-do View Post
    Helmut,

    Will they remove most of the dirt out of the area? Man, someone is getting some prime tear/beer soaked clean landfill dirt!
    No they will just degrass and excavate for footings and drainage.

  2. #98

    Default Re: Is that a construction cam?

    Quote Originally Posted by Zeebart21 View Post
    I'm assuming if a few more people get excited about phase 1 there will be more "sticky" added to this thread than needed.

    Z

  3. #99

    Default

    Quote Originally Posted by HelmutVII View Post
    Busting butt this morning (Monday 3/24) on the French drain on the Press Box side of the tunnel. If they are lucky, and don't run into problems, they should be finished (or close to it) by tomorrow afternoon.

    http://ragincajuns.com/sports/2013/5...ility_cam.aspx

    Definitely the home of the Cajuns is not complete without a French drain. Let's do everything first class without skimping.
    They started this morning about 7:00 A.M.

  4. #100

    Default Re: Is that a construction cam?

    Quote Originally Posted by HelmutVII View Post
    Finished the French drain yesterday afternoon. Staring to bust butt on degrassing and excavation on the press box side. Looks like they will start on the press box side and work to the student side. Rain coming tonight and tomorrow. They better get busy and make sure the hill gets safed in by this afternoon.
    I thought they were going to be removing the pumping shed? Looks like they are working around it

  5. Default Re: Is that a construction cam?

    Quote Originally Posted by ulforlife View Post
    I thought they were going to be removing the pumping shed? Looks like they are working around it
    ----Helmut ---what about the visitors locker room??--Have you seen what the final plans are and what it will look like???

  6. #102

    Default Re: Is that a construction cam?

    Quote Originally Posted by cajunfan337 View Post
    He watched too much of the construction cam.........(got no internet around these parts.....Banjo's playing)

  7. #103

    Default Re: Is that a construction cam?

    They better hurry, because it's storming here in the Houston area.....get ready in about 2 hours!


  8. #104

    Default Re: Is that a construction cam?

    They definitely got some work done today. All the grass is gone.


  9. #105

    Default Re: Is that a construction cam?

    Quote Originally Posted by Boomer View Post
    ----Helmut ---what about the visitors locker room??--Have you seen what the final plans are and what it will look like???
    Don't know anything about a visitors locker room.

    Looks like they are removing the degrass pile from the top of the hill this morning (3/27). If it rains and soaks the pile then it will be hell to pay to get it off. Not to mention the mud flowing down the hill if we get some heavy rains.

  10. #106

    Default Re: Is that a construction cam?

    They're hauling the dirt away now.

    By the way, it is very nice to see actual progress and machines working. Unlike other facility improvements around the state, we seem to actually get ours done. Similar to the uniform provider change, it's not at the speed and prestige that most on the forums want, but I'll take slow progress over no progress.


  11. Default Re: Is that a construction cam?

    Quote Originally Posted by HelmutVII View Post
    Don't know anything about a visitors locker room.

    Looks like they are removing the degrass pile from the top of the hill this morning (3/27). If it rains and soaks the pile then it will be hell to pay to get it off. Not to mention the mud flowing down the hill if we get some heavy rains.
    ----The visitors locker room was suppose to go under the hill on the Press box State Farm gate side---Was wondering how it would fit in the hill!!!

  12. #108

    Default Re: Is that a construction cam?

    Quote Originally Posted by Boomer View Post
    ----The visitors locker room was suppose to go under the hill on the Press box State Farm gate side---Was wondering how it would fit in the hill!!!
    Attached is the only plan for the visiting locker room that I saw in the master plan document.

Page 9 of 45 FirstFirst ... 6 7 8 9 10 11 12 19 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. Campus Construction
    By HelmutVII in forum Up On LA
    Replies: 933
    Last Post: September 20th, 2021, 09:20 am
  2. UL football under construction
    By NewsCopy in forum Football
    Replies: 0
    Last Post: December 17th, 2010, 04:14 am

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •