Oh so now I think of it-----Could have had a Giant Hill
Slide for all the kids ----After practice the football team could have
made a small visit ------The last Down Hill or I slid the Hill at Cajun Field!!
Well I guess I would have wanted the T-Shirt!!!! lol
the seats around that tunnel are going to be insane - especially when the team is coming through it
Any idea what they will do with that pumping station at the bottom of the hill. I assume the entry to it is within the tunnel. If so they can put seats above it.
Curious...Did the move the flag poles to the other side or will they put them back once the construction is done?
Looks like their digging/excavating around the pump and the tunnel exit. Maybe it will be moved/changed after all.
Any idea when they start on the buildings? I'm just wondering about the meeting rooms and what not.
Construction has started in earnest yesterday and today (March 19 and 20). I would suspect they will work can to can't Monday through Saturday. Maybe on Sunday if they get rained out during the week. You will see them excavating along the retaining wall to place a geotextile fabric, stone and perforated pipe to make a french drain and then work their way up the hill. They will place this up the hill at predetermined locations. they will then place reinforcing steel, formwork and then place concrete. I suspect they will divide the project into three (maybe four) sections. That means they will do this at least three times. Each time starting at the retaining wall and working their way up the hill.
As I have stated in previous post in this and other threads, If they start in March they will make it for the end of August. The trailer located at the south student side gate is a job shack for Lemoine to use as an office during construction.
Man! I bet whoever is driving that Bobcat, or whatever it is up and down that hill has an extreme pucker factor.