Lots of work done today. Looks like they have everything ready for the rain we are anticipating today and tomorrow. It looks really good. they have all of the silt fencing up along the trench drains and they have no loose mateerial at the top of the hill.
Regarding the piling, it all depends on the geotech report. If the soil is good then they just need to make sure the concrete does not slide down the hill. We will see.