All I know is that the field has to be ready, at the latest, by July 16th, the date of the 2nd Annual "Drums Across Cajun Field", one of Drum Corps International's newest competition shows.
http://www.dci.org/schedule/?week=Week4
All I know is that the field has to be ready, at the latest, by July 16th, the date of the 2nd Annual "Drums Across Cajun Field", one of Drum Corps International's newest competition shows.
http://www.dci.org/schedule/?week=Week4
I would say they have about two weeks of work before they start laying the underlayment and turf. First the gold post has to be set. The stone poured, raked and rolled to the desired level. I would say that this is atleast two weeks of work. The laying of the underlayment and turf and paint will take another two weeks.......I will say the job completion will be around July 10th or 12th........with no rain delayes and the turf contractors are on time and don't have another job set up. This is based on watching the progress on the installation of the turf at McNesse....58 days and a beautiful job I might say.
It is a crushed stone. There are various grades of crushed stone depending on the mixture of sizes of individual stones in the mix. Smaller stones on down to fines gives better compaction when mixed with larger stones. A mix with a predominance of one size stone will not compact very well but will give excellent drainage. I have seen the stockpiles of stone at the stadium and they are opting for drainage.
Looks like they have hauled in some crushed stone this afternoon. They were able to work even after the pretty heavy rain earlier today (6/13). Looks like the beginning of the end now and they just might make for July 16th. Lets hope the installation crew isn't hung up somewhere else.
Lots and lots and lots of crushed stone today (6/14). They have half the field that we can see in the camera covered with it.
http://s209.photobucket.com/albums/b...view=slideshow
Shots form the swamp putting down the stone. Also shows the anchors for the gold post. this stone will be about 1" deep. It's purpose is to cover the inperfections on the field. 12noon 6/14/2008
Frenchie
Thanks Frenchie, you do us a great service.
Thanks for the blogs as well.
Agreed. The pictures are a huge help.
They told me that they would finish the stone work tonight about 8-9 o'clock. I am not sure but I think the gold post will go up next. That has to be in place before they roll out the underlayment and turf. Just checked the field about 7:30 but did not have my camera with me. Tomorrow..... Looks good.......
That field is lookin good! Movin along nice!
http://s209.photobucket.com/albums/b...view=slideshow
June 16,2008 Monday: Putting the finishing touch on the aggregate. Going over it with a screen to smooth it out. Inspecting it for any large pieces of aggregate and bare spots. Gettng the underlayment pad ready to roll out.......looking good. Things will go at a faster pace now.
Frenchie