    Turbine. I have that photo in printed form I will see if I can scan it. It may have to be in pieces so I can maintain the resolution and keep the file size reasonable. That was the inside cover of the 1965 or 1966 yearbook. I might even try to scan the inside cover of that yearbook. I have looked through some of the yearbook I have and have found construction photos of cajun field, the new (now being renovated) student union, Doucet Hall, and Wharton Hall. I have been unable to find photos of Dupre Library as a single story. I have been able to find a few photos of the library during and right after the two story addition. I will scan those and add them to the collection. The mid to late 60's saw a pretty extensive building boom on campus, with Dupre Library additions, Doucet Hall, Wharton Hall, Angelle Hall, Voorhies Hall, old Denbo and Bancroft halls and Cajun Field. Martin Hall and F G Mouton Hall were built in the early 60's.


  2. #314

    Default Re: Student Union Construction.

    Was HL Griffin an early 70s construction? I thought it was fairly new the first time I went into it in 1975.

    Last edited by BeauCajun; October 17th, 2013 at 08:26 am. Reason: forgot it

  3. #315

    Default Re: Student Union Construction.

    I started at USL in the Fall of 1972 and, if I remember correctly, Griffin was opened the year before. The building was brand new when I took freshmen English courses.

    There were escalators that ran from the first to third floors. They never worked and would randomly stop abruptly. They eventually took them out. I never used the escalators because the stairs were faster.


  4. #316

    Default Re: Student Union Construction.

    Quote Originally Posted by CAJUNJUDO View Post
    I never knew that there used to be a baseball field where Fletcher Hall is located....
    And the two really old buildings to the Johnston st side of the ballfield housed Indus Arts/Tech and the althletic office. Used to pick up the game programs that the Arnold Air Society would sell at the football games. We made a few cents on each sale. Remember asking Whitey Urban for a "raise." Fastest I've ever been thrown out of an office.

  5. #317

    Default Re: Student Union Construction.

    Although I am not a good photog, here are some pics that I took this Friday. I took them while standing on the raised planter, on the Ball Room side of the swamp, showing the progress of the new courtyard area, etc

    Attached Images Attached Images      

  6. #318

    Default Re: Student Union Construction.

    Here are a few photos of the Student Union taken on November 3, 2013.

    The food service wing is really starting to take shape. Once they get the roof on it will be pretty much out of the weather and the winter will not slow them up too much.

    A view from Boucher Drive near the front of Buchanan Hall. The second story window opening will over look a plaza that will be where Guillory Hall is now.

    nov-3-1jpg

    A view of the food service wing from the Harris Hall fire escape.

    nov-3-2

    Placing plywood sheeting on the roof to accept roofing felts and shingles. Taken from the stair of the eye sore buildings.

    nov-3-7

    Roof of the food service wing as seen from the top of Olivier Parking tower. I don't think we will be able to see this from here much longer. The roof of the main portion of the building should block most of it.

    nov-3-4

    The main portion of the building as seen from the top of Olivier Parking tower.

    nov-3-3

    View of the McKinley street facade as seen from the rear of Our Lady of Wisdom Chapel.

    nov-3-5

    View of the Cypress lake plaza area as seen from a Cypress Lake planter.

    nov-3-6


  7. #319

    Default Re: Student Union Construction.

    Work continues to progress on the Union. I did not take too many photos this week. It was too nice of a day and I needed to work in my garden.

    This is a view of the food service wing near the front of Buchanan Hall.

    nov-10-12

    A few guys working today [lacing a decorative concrete band at the roof line. This will match the band on the older part of the building that was not demolished.

    nov-10-13

    A view of the food service wing from the balcony of Guillory Hall.

    nov-10-11


    A view of the Cypress Lake Plaza area as seen from a planter adjacent to Cypress Lake.

    nov-10-10


  8. #320

    Default Re: Student Union Construction.

    Work is coming along nicely. Looks like they have the food service wing pretty much out of the weather just in time for the Winter.

    Food service wing as seen from the steps to Buchanan Hall.

    nov-23-1

    Food service wing as seen from the Harris Hall fire escape.

    nov-23-2

    McKinley Street facade as seen from the back of McLaurin Gym.

    nov-23-3

    McKinley Street facade as seen from the old parking lot entrance. This will be the main entrance to the McKinley Street side of the building.

    nov-23-4

    Interesting graffiti on one of the stairwells of Olivier Parking tower.

    nov-23-5

    View from the top of the Olivier Parking Tower.

    nov-23-6

    View of the McKinley Street facade as seen from the rear of Our Lady of Wisdom Chapel.

    nov-23-7

    View of the Cypress Lake Plaza from a Cypress Lake planter.

    nov-23-8

    View from the Guillory Hall balcony.

    nov-23-9


  9. Default Re: Student Union Construction.

    OK---this is just crazy---We have the student union, the Quad, the new parking garage, the arch building, the South end zone, the Athletics performance Center, and the Track/soccer construction----Am I leaving out anything---When it was said one Billion in just finished or in the works and future they weren't kidding!!!!!!!!! Yea WOW!!!


  10. #322

    Default Re: Student Union Construction.

    Hey HelmutVII, did they by chance save the USL Bulldog tile mosaic by the bookstore before tearing it down?


  11. #323

    Default

    Quote Originally Posted by Redgineer View Post
    Hey HelmutVII, did they by chance save the USL Bulldog tile mosaic by the bookstore before tearing it down?
    I would hope so!

  12. #324

    Default Re: Student Union Construction.

    Quote Originally Posted by Redgineer View Post
    Hey HelmutVII, did they by chance save the USL Bulldog tile mosaic by the bookstore before tearing it down?
    I remember reading some where that they did indeed save the "Bulldog". I can't remember where I saw it though.

Page 27 of 64 FirstFirst ... 17 24 25 26 27 28 29 30 37 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 13 users browsing this thread. (0 members and 13 guests)

Similar Threads

  1. Student Union Update
    By NewsCopy in forum RECORDED it
    Replies: 0
    Last Post: March 6th, 2014, 02:48 pm
  2. Good Bye Student Union
    By RaginCajun23 in forum Up On LA
    Replies: 24
    Last Post: January 5th, 2013, 11:02 am
  3. Student Union...
    By raginlittlecajun in forum Up On LA
    Replies: 11
    Last Post: November 23rd, 2010, 06:27 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •