    Finally some progress in getting out of the ground.

    This is the new food service wing as seen from the side of Corona residence hall. Guillory hall is to the right. It has taken some time to get to this point because of all the underground water and sewer lines for the new kitchen. Storm drainage pipes are in the foreground waiting to be installed.

    may-5-1

    A view from the rear of McLauren Gym. This will give you an idea of how far the middle section of the building is being moved towards McKinley street.

    may-5-2

    A view from the top of Olivier Parking tower. They are installing auger cast piles by using the rig with the ladder auger on the left.

    may-5-3

    Auger cast piles installed next to the bookstore.

    may-5-4

    Auger cast piles installed next to the ballroom/theater.

    may-5-6

    Close up of the top of an auger cast pile. Auger cast piles were used under Olivier parking tower. The sheet metal top will be removed when the foundation is constructed

    may-5-7

    Front view of Buchanan Hall from the rear of Guillory Hall

    may-5-8


    Rear view of Buchanan Hall as seen from the Rose Garden

    may-5-9


  2. #158

    Default Re: Student Union Construction.

    Good weather this past week has allowed for more progress.

    They placed concrete foundation and slab for the dining area of the food service wing last week. This view is from the Harris Hall fire escape. The Kitchen area is closest to the camera. you can tell by all the pipe stub outs sticking up above the floor level.

    may-19-1

    Another view from the rear of McLauren Gym. New kitchen is closest to the camera.

    may-19-2


    View of the main portion of the building from a planter next to Cypress Lake. Bookstore is to the left and ball room is to the right.

    may-19-4

    Flaming pepper scratched into a make shift door ramp. This is on one of the "eyesore" buildings and thankfully this will be demolished.

    may-19-7

    A tried and true method for water level control in Cypress lake. (yes it is what you think it is but on a larger scale)


    may-19-3


    Rear view of almost completed Buchanan Hall. It looks very nice.

    may-19-5

    Front view of almost completed Buchanan Hall.

    may-19-6


  3. #159

    Default Re: Student Union Construction.

    Quote Originally Posted by HelmutVII View Post
    A tried and true method for water level control in Cypress lake. (yes it is what you think it is but on a larger scale)

    may-19-3
    A floating disco ball???

  4. #160

    Default Re: Student Union Construction.

    More progress this week means they will be erecting steel pretty soon. As seen from the rear of Guillory Hall.

    may-26-7

    More mechanical and plumbing work being done in the new area for the kitchen.

    may-26-3

    Large chilled water lines leaving and returning to the mechanical room. As seen from the rear of McLauren Gym.

    may-26-4

    A look into the hall between the ballroom (right) and theater (left).

    may-26-5

    A view of the main building from a planter box next to Cypress Lake.

    may-26-6

    A view from the front entrance to almost finished Buchanan Hall

    may-26-8


    A view of the front of the almost finished Buchanan Hall

    may-26-2

    A view of the rear of the the almost finished Buchanan Hall

    may-26-1

    Buchanan Hall has turned out to be a very nice building. I understand it will be used for general office space. I don't know that for sure though.


  5. Default Re: Student Union Construction.

    Nice work.

    Where did you have to get to take the picture of the rebar looking structure with the 100 on it?

    and thanks for the commitment to tracking the progress.


  6. Default Re: Student Union Construction.

    I drove the campus today and am really disappointed in the back of the new dorm areas---tire rut marks with the concrete stoppers all turned --just really shabby looking---We need to address this ASAP!!! Too much money and effort to not have a first class surrounding!!!


  7. #163

    Default Re: Student Union Construction.

    Quote Originally Posted by Turbine View Post
    Nice work.

    Where did you have to get to take the picture of the rebar looking structure with the 100 on it?

    and thanks for the commitment to tracking the progress.

    I was standing on top of some transformers located behind Corona Hall to the left in the photo below. The rebar structure is the boom of the crane in the photo below. The 100 means the joint in the boom is 100 feet from the pivot point. It's all about balance and leverage when using a crane. (especially crawlers).

    may-26-7

  8. #164

    Default Re: Student Union Construction.

    Quote Originally Posted by Boomer View Post
    I drove the campus today and am really disappointed in the back of the new dorm areas---tire rut marks with the concrete stoppers all turned --just really shabby looking---We need to address this ASAP!!! Too much money and effort to not have a first class surrounding!!!

    It's a good thing you didn't go in the stairwells in Olivier Parking tower. It's pretty bad. Graffiti on the walls and fast food bags and wrappers all over the place.

  9. #165

    Default Re: Student Union Construction.

    No steel yet. It looks like they will wait until the next concrete placement to start. If the rain holds off I don't think it will be too long.

    View of the food service wing as seen from the newly finished Buchanan Hall.

    JUNE-2-1

    Getting close to placing concrete for the kitchen area of the food service wing.

    JUNE-2-2


    Another view of the food service wing as seen from the north Harris Hall fire escape.

    JUNE-2-3

    Same area as seen from the Guillory Hall balcony.

    JUNE-2-4


    Wide shot of the main building. Still working on foundations and underground mechanical lines.

    JUNE-2-5


  10. #166

    Default Re: Student Union Construction.

    Thanks, I look forward to these updates.


  11. #167

    Default Re: Student Union Construction.

    Quote Originally Posted by SlappyCajun View Post
    Thanks, I look forward to these updates.
    I am glad you do. It's really no problem, I cross the street and I'm there.

  12. Default Re: Student Union Construction.

    Hey Helm---looks like this is taking longer than the dorms--my imagination or just a different animal???


Page 14 of 64 FirstFirst ... 4 11 12 13 14 15 16 17 24 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 10 users browsing this thread. (0 members and 10 guests)

Similar Threads

  1. Student Union Update
    By NewsCopy in forum RECORDED it
    Replies: 0
    Last Post: March 6th, 2014, 02:48 pm
  2. Good Bye Student Union
    By RaginCajun23 in forum Up On LA
    Replies: 24
    Last Post: January 5th, 2013, 11:02 am
  3. Student Union...
    By raginlittlecajun in forum Up On LA
    Replies: 11
    Last Post: November 23rd, 2010, 06:27 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •