Photos of work done on July, 29 2015
A rare instance when the guy operating the demolition equipment was out of the cab. I think he is out of the cab only when going from one machine to another, getting something to drink or eat or to pee. (I'm also thinking the cab is air conditioned).
A little over half way through the building. They should have most of it down by tomorrow afternoon.
Hammering away at 6:30 in the evening.