    Quote Originally Posted by I_Bleed_RED View Post
    I cant wait until the union, parking garage, and the quad are done. The campus will look so much better and the campus wont feel like a big construction site. I know we'll always have construction on campus, but we're doing a lot of it in a small surface area.
    Will all of it be finished by Labor Day? A lot of alumni will be in for football games. It would be nice to tour a finished campus.

  2. #434

    Default Re: Student Union Construction.

    Quote Originally Posted by HoustonCajun View Post
    Will all of it be finished by Labor Day? A lot of alumni will be in for football games. It would be nice to tour a finished campus.
    Don't think so. The last post I saw from Carter USA was it was scheduled to be delivery late in 2014.

    http://www.carterusa.com/projects/un...-student-union

  3. #435

    Default Re: Student Union Construction.

    Quote Originally Posted by CajunAmos View Post
    Isn't the union always open?
    Don't know about now, but when my now wife worked there while in school she locked it up one night a week. I helped her many times in closing the union up overnight, and could even do it myself after awhile. The keys, then had to be returned to the UP's for overnight, where the morning person would pick them up to get it opened early. So it wasn't 24/7 in the late 90s. It was open 7 days a week, but just closed overnight. I believe, it closed at 10:30PM every night unless someone had something booked past then, like a dance, movie showing, etc. Most Sun-Thur nights was a regular 10:30 close, but easily stayed open a little later on the weekend nights due to those events going on.

  4. #436

    Default Re: Student Union Construction.

    A little bit different view now that the construction fencing has been moved to allow for students to move out of Corona and Bonin Halls. This is a view from the side of Harris Hall as I am standing in Boucher Street.

    may-11-32 by Rosegardendorms, on Flickr

    As seen from the Olivier Parking garage.

    may-11-30 by Rosegardendorms, on Flickr

    Metal cladding is finished near Guillory Hall. I still don't like it but it is what it is.

    may-11-33 by Rosegardendorms, on Flickr

    As I expected. They cannot clean on a timely basis the buildings they are constructing. This is typical of what I found in Olvier Parking tower. The stairwells were worse one smelled of urine.

    may-11-31 by Rosegardendorms, on Flickr


  5. #437

    Default Re: Student Union Construction.

    Quote Originally Posted by HelmutVII View Post
    Metal cladding is finished near Guillory Hall. I still don't like it but it is what it is.

    may-11-33 by Rosegardendorms, on Flickr
    Ok, I was fine with a little bit of cladding in a few places, but literally doing the whole backside in it looks gahbage

  6. Default Re: Student Union Construction.

    Quote Originally Posted by cajunfan337 View Post
    Ok, I was fine with a little bit of cladding in a few places, but literally doing the whole backside in it looks gahbage
    ---Just had the whole part of the condo replaced ---Big building that I have a small part of---Mexicans replaced in 3 days---I don't like it either but will be easy fixing I think if we later want to change---Get the damn thing done---As usual I yield to Helmut to see if this is correct!!!

  7. #439

    Default Re: Student Union Construction.

    A few pics from recent trips. This first few sets are from about a week ago: I was able to get up on the planter and then walk along the brick fence, so there are better views of the new Food Service area, as well as looking back towards the Ballroom/Bayou Bijou. When I went back this morning, they have erected a fence to try to prohibit climbing up on the planter/wall, but then the whole courtyard entrance was left open, so I was able to snap a few pics of previously unseen areas. I'll post those next.
    Top pic: looking into the main entrance
    2nd pic: Food Service wing, looking towards Boucher
    3rd pic: close up of the first floor of the Food Srvc wing, looking toward McKinley

    Attached Images Attached Images      

  8. #440

    Default Re: Student Union Construction.

    View of the Ballroom area

    Attached Images Attached Images  

  9. #441

    Default Re: Student Union Construction.

    Pics from this morning
    1st pic: entering the new 'plaza' area, looking towards McKinley. View of the Ballroom area
    2nd pic: plaza area, looking towards Boucher
    3rd pic: looking toward St Mary. New side walks behind Bayou Bijou
    4th pic: looking toward McKinley, new sidewalks for Wharton-side entrance

    Attached Images Attached Images        

  10. #442

    Default Re: Student Union Construction.

    More pics from this morning
    1st pic: behind Wharton, looking towards St Mary. Apparently they are enclosing an area behind Burke-Hawthorne to make a service utility area? Anyway, there will be one less access from/to Wharton-Cypress Lake. You can also see the pretty extensive work being done to enclose the Wharton HVAC system....I really like that detail, :-)
    2nd pic: another, close up view of the Wharton HVAC project.

    Attached Images Attached Images    

  11. #443

    Default Re: Student Union Construction.

    1st pic: from Guillory Hall balcony, view of the new Food Service wing.
    2nd pic: close-up view of the Food Service wing. Note the new low-brick wall going up to enclose a terrace area? Looks like they trying to match the Cypress Lake wall
    3rd pic: still on a Guillory balcony, looking towards Boucher.

    Attached Images Attached Images      

  12. Default Re: Student Union Construction.

    Nice.

    Thanks


Page 37 of 64 FirstFirst ... 27 34 35 36 37 38 39 40 47 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 19 users browsing this thread. (0 members and 19 guests)

Similar Threads

  1. Student Union Update
    By NewsCopy in forum RECORDED it
    Replies: 0
    Last Post: March 6th, 2014, 02:48 pm
  2. Good Bye Student Union
    By RaginCajun23 in forum Up On LA
    Replies: 24
    Last Post: January 5th, 2013, 11:02 am
  3. Student Union...
    By raginlittlecajun in forum Up On LA
    Replies: 11
    Last Post: November 23rd, 2010, 06:27 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •