Page 34 of 76 FirstFirst ... 24 31 32 33 34 35 36 37 44 ... LastLast
Results 331 to 340 of 760

Thread: Student Union Construction.

  1. #331

    Default Re: Student Union Construction.

    Quote Originally Posted by Boomer View Post
    HOLD ON--The entire APC has to go up , then the phase II stadium upgrade ergo the entire administration building going to the stadium and then the cox goes and the plaza is finished off with the beautification part!!! As I end so many of My POSTS---I think!!! lol
    Too bad they didn't include a new scoreboard being added at the same time as the SEZ. We will have to wait about 4 - 5 years for one when the stadium is completed.

  2. Default Re: Student Union Construction.

    Don't forget that there will also be a stadium seat addition on the home side near the North end zone to match the other side's previous extension!!!!! Cool!!!


  3. #333

    Default Re: Student Union Construction.

    Figured it out....please disregard


  4. Default Re: Student Union Construction.

    Those numbers have to mean something else.

    Restrooms 3,540


  5. #335

    Default Re: Student Union Construction.

    Quote Originally Posted by Turbine View Post
    Those numbers have to mean something else.

    Restrooms 3,540
    SF = square footage. Figured it out about 2 seconds after I made the post; think the cold, dreary weather is getting to me, lol

  6. Default

    Quote Originally Posted by cajuns_fan View Post
    SF = square footage. Figured it out about 2 seconds after I made the post; think the cold, dreary weather is getting to me, lol
    Thanks I don't think I would have figured that out.

  7. #337

    Default Re: Student Union Construction.

    I went by the campus today, and got a good status/view of the various construction sites. Overall, not any dramatic changes since Helment's last post, so I didn't take many pics. However, I did get a kick out of staking out all of Helment's spots (Harris fire escape stairs, etc.), lol.

    A few observations:
    1. The Quad: work continues, but not very 'scenic'.....just looks like the new drainage systems have been laid and buried. Since the sun was setting, pics were impossible anyway....
    2. The Lewis St garage, & Fletcher: nothing started yet, as I think they are waiting until after the semester to get started in earnest on those...??
    3. St. Mary re-striping: There are posters along St Mary announcing the re-striping for the bike lanes, to begin in December, but nothing done yet. Again, they must be waiting until after the semester is over to begin. BTW, the pics show the two car lanes on the inside, with the bike lanes on the outside.
    4. The Union:
    A. I was kind of curious about the distance between the food wing and the swamp: seemed kind of narrow in the renderings. But from my view while standing on the Guillory balcony I have to admit it looks ok in 'reality.' Again, I just hope they keep (or rebuild) the 'overlook' balcony area that juts out over the swamp.
    B. Work is really progressing, especially on the center part, but still a lot of scaffolding around everything, so it's really hard to get a good view of things. Much of the roofing of the new center part is done, giving a good 'feel' of what it will be like when completed.
    C. But I was most impressed with the progress of the courtyard area. I stood on the planter closest to the
    Ballroom wing, so I got a good view of everything. I have to admit: I really think that courtyard area is going to be VERY nice indeed! My heart actually skipped a beat when I envisioned the finished project, ;-)

    Anyway, sorry for the long post, but had a boring day otherwise, so really enjoyed my little outing. Below are some (not so great) pics that I took while looking at the courtyard.....
    (The last pic shows the addition from the ballroom towards the courtyard.)

    Attached Images Attached Images

  8. #338

    Default Re: Student Union Construction.

    Appreciate the post! Keep them coming!


  9. #339

    Default Re: Student Union Construction.

    Found this on the "Lafayette Memories" Facebook page. Per that post, this is UL, circa 1939. I also added it to the 1939-40 thread, but thought I'd share it here as well.

    Attached Images Attached Images

  10. Default Re: Student Union Construction.

    I wonder what a present day photo from the air would look like!!! Buy all the property close to campus as you can I guess this is the moral of this photo!!!!1 Tulane should have bought all of that Claiborne Ave area after the hurricane!!!!


Page 34 of 76 FirstFirst ... 24 31 32 33 34 35 36 37 44 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Student Union Update
    By NewsCopy in forum RECORDED it
    Replies: 0
    Last Post: March 6th, 2014, 01:48 pm
  2. Good Bye Student Union
    By RaginCajun23 in forum Up On LA (Academics)
    Replies: 24
    Last Post: January 5th, 2013, 10:02 am
  3. Student Union...
    By raginlittlecajun in forum Up On LA (Academics)
    Replies: 11
    Last Post: November 23rd, 2010, 05:27 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •