Re: Construction Cam is Up!!!!!!!!
Just a play on the Larry Byrd and M. J. McDonald's shoot around "horse" commercial's!..O..
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
raginsaints
Is that a tornado or funnel cloud in the top right hand corner?
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
DaddyCajun
Helmut is my choice, or you Boomer! Call AD office and see who ok'd the cameras being put up, then tell them your idea of repositioning the camera's and the benefits potentially in Season Ticket sales, Advertising, and Recruiting!
----So I call Matt Casbon and tell him that when he goes on RP to check out the photos and start using this as an add campaign---or do I call RCAF----or do I call the prettiest interim AD in the Country----or do I call the baseball office---or do I call Young Billy's program when the Bab is on???
Re: Construction Cam is Up!!!!!!!!
Unloading precast concrete stadium seating sections this afternoon.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Boomer
----So I call Matt Casbon and tell him that when he goes on RP to check out the photos and start using this as an add campaign---or do I call RCAF----or do I call the prettiest interim AD in the Country----or do I call the baseball office---or do I call Young Billy's program when the Bab is on???
#3 of course!
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Frenchie35
I know for a fact that they worked night and day on the end-zone seating at cajun field towards the end. The night crews preferred it because it was cool at night. So maybe, just maybe they are doing the same here.
https://encrypted-tbn0.gstatic.com/i...pW4iOBzbqY0r71
Re: Construction Cam is Up!!!!!!!!
No work tonight. Last night must have been for an unusual situation.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
HelmutVII
No work tonight. Last night must have been for an unusual situation.
Last night was head turning for sure. I think you may have been right in regards to getting ready for Monday. They worked in one small area for a number of hours. I can only assume it was to correct something with the structural steel. Hopeful we will see roofing installation starting in the a.m.
Re: Construction Cam is Up!!!!!!!!
What's the deal with the one section that has the cinder blocks (getting covered with the DensGlass) on the outside rather than having the metal studs outside of that?
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
wcd35
What's the deal with the one section that has the cinder blocks (getting covered with the DensGlass) on the outside rather than having the metal studs outside of that?
Not sure I follow but the DensGlass should be applied to the metal studs all the way around the backside. This is where your moisture/vapor barrier is located and that needs to be a seamless unbroken system. The cinder blocks are for the interior structure (bathroom). There will be an air gap between the cinder blocks and the DensGlass. Brick/Stucco will be applied off the DensGlass.