Re: Construction Cam is Up!!!!!!!!
Placing concrete at the third base line entrance this morning. That is good because it means no more heavy traffic at this location. Moving into the end of the beginnig and on to the beginning of the end.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
LaCajunsFan
Do i see the first of the red bricks getting ready to go up?
I don't see any bricks on site.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
HelmutVII
Moving into the end of the beginning and on to the beginning of the end.
Best statement yet......
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Frenchie35
Best statement yet......
Almost like a Moody Blues song (Days of Future Past)
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
BeauCajun
I don't see any bricks on site.
Bricks are on site. Should be going up with brick work this week.
Re: Construction Cam is Up!!!!!!!!
The roof appears to be about 2/3rd installed over the grandstand area and the runners are going up for the grandstand seating. Probably 25% done with the runner installation. The risers are aluminum and should also go up quickly.
I see no reason why grandstand seating can't be completed for March 3rd. The question is will enough other life/safety issues be addressed so we can access those seats?
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
CajunAmos
Almost like a Moody Blues song (Days of Future Past)
Actually it's a paraphrase from Winston Churchill.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
HelmutVII
Actually it's a paraphrase from Winston Churchill.
Didn't know that, thanks
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
cajunref
Bricks are on site. Should be going up with brick work this week.
That would be good. The grandstand exterior brick work will require two weeks minimum and that is under idea conditions (reality will take longer). There is a lot more brick than that to get done and I suspect brick work won't be completed for March 3rd but it would be nice to get the majority of it knocked out.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Cajun90
That would be good. The grandstand exterior brick work will require two weeks minimum and that is under idea conditions (reality will take longer). There is a lot more brick than that to get done and I suspect brick work won't be completed for March 3rd but it would be nice to get the majority of it knocked out.
Get the grandstand area done. The bleacher brick can wait. JMO
Re: Construction Cam is Up!!!!!!!!
I would assume there's an elevator or two?
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
BeauCajun
I don't see any bricks on site.
Yeah, it looks like they are working on the concrete are outside the 3rd baseline entry, not the bricks........