Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
CajunAmos
Pretty sure the press box is in the third base end of the second level. I also think the club room is on the second level with suites on the top level.
Now i'm confused. It looks like there are only two levels. I'd Like to see a blue print of the project.
Re: Construction Cam is Up!!!!!!!!
There are four levels. The top of the grand stand will be at the floor level of the third level. I THINK FROM WHAT I CAN SEE IN THE RENDERINGS. The third level will be a concourse for SRO. The fourth level will be press box along third base line and suites along the rest of the fourth level.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
leeman
How is the Densglass attached to the steel beams? I don't see any screws.
It is screwed on with self tapping screws with an over sized head.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
RedBug58
I know a guy with an oversized head. His nick name is "Bucket Head".
Quality stuff, Steve-0!!! LOL
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
HelmutVII
There are four levels. The top of the grand stand will be at the floor level of the third level. I THINK FROM WHAT I CAN SEE IN THE RENDERINGS. The third level will be a concourse for SRO. The fourth level will be press box along third base line and suites along the rest of the fourth level.
A portion of the third level will be the Stadium Club level which per the release a few months ago the benefits are Cash Bar/Food (Beer/Wine/Upscale food), AC/Heat, TV's, Lounge Chairs, Tables, etc
http://www.dlrgroup.com/media/729902...enry_large.jpg
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
wcd35
Looks like a place you can go if you don't want to watch baseball.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Bankruptcyman
Looks like a place you can go if you don't want to watch baseball.
It will be used for functions outside of the baseball season as well, so it will be a money maker for the program. Diamond Club meetings are likely going to be there once ready
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
ragincajun10
Speaking of Diamond Club, not sure I've gotten anything about renewing membership. Melrock, when should we expect that?
Hoping to get it out this week. Waiting on a few things from the office.