Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
ATXCajun
Yeah, but how's the cell signal in that box?
Most big metal building made to house office space now puts cellular extenders inside the building to enhance the available signal.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
BirdofParadise
They have to refurbish the portable buildings before they can move the athletic offices, compliance, sports info, etc. And, only then can they demolish the main building.
I'm hearing six months or so. But, like everything else, it could take a little longer.
I've been told that we are requesting permission to tear down the Cox building at an upcoming ULS board meeting. Since it is a state building, we must request permission.
Re: Construction Cam APC ( Athletic Performance Complex )
Well this is news how? Scott FormerAD already said we were taring it down after the last game. So UR giving us a civics lesson?
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
Rebel02
I've been told that we are requesting permission to tear down the Cox building at an upcoming ULS board meeting. Since it is a state building, we must request permission.
I would have thought that would have been requested at the time the new project was approved and construction started.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
HelmutVII
Upon further review I realized I did not understand what was asked. See the additional steel siding that will be placed. I think it will look pretty much like the area of the photo graph directly above Coach Robes left shoulder.
Do you think this area would be the new opponents dressing room?
Re: Construction Cam APC ( Athletic Performance Complex )
I would guess that they keep the Cox locker room for visitors this year!!! Logistics with bringing in equipment etc!!
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
RedCajun
Wow! That is a ton of power stations
[IMG]<blockquote class="twitter-tweet" lang="en"><p lang="en" dir="ltr">Equipment arrives August 31st from Power Lift <a href="https://twitter.com/hashtag/countingdownthedays?src=hash">#countingdownthedays</a> <a href="http://t.co/FMG6SoAaf0">pic.twitter.com/FMG6SoAaf0</a></p>— Cajun Strength (@CajunStrength) <a href="https://twitter.com/CajunStrength/status/634791239515140096">August 21, 2015</a></blockquote> <script async src="//platform.twitter.com/widgets.js" charset="utf-8"></script>[/IMG]
The power-lift equipment mentioned in that tweet is top of the line stuff. You can see on the below link some of the top programs using Power Lift.
Each on the flush platforms with be outfitted with a multi use power rack
http://www.power-lift.com/
Also look at the size and number of speakers. It should be rocking in there.~..~.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
CajunAmos
Do you think this area would be the new opponents dressing room?
Jay said the Cajuns locker room door is about 10 yards from the tunnel and that's the only door that close.
Re: Construction Cam APC ( Athletic Performance Complex )
Is a quad still the intended idea for where the Cox building sits?