Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
HelmutVII
I think the electricity is cut off to that portion of the stadium so nothing to power the camera. They might be able to get power from the track and field facilities or the mechanical building.
Put the camera on the score board. They can find power somewhere. I mention this a while back. Why don't they have the camera system they had for the SAPC. It panned left and right and also panned in for closeups. They also had the dates for each day of construction. You could go to any date and see what was done.....I guess that's asking for to much......
Re: Construction Cam is Up!!!!!!!!
Drove by today, there is a large gap between the steel structure and the back of the right field bleachers. Is the deck going between that or when they extend down the line it won't go as far to Reinhardt as the main structure does?
Re: Construction Cam is Up!!!!!!!!
They ain't messin' around! I'm told there is a 2 AM concrete poor of the 2nd and 3rd floor of the baseball stadium. Should be starting in a couple hours... Wow!
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
cajundiehard
They ain't messin' around! I'm told there is a 2 AM concrete poor of the 2nd and 3rd floor of the baseball stadium. Should be starting in a couple hours... Wow!
Yeah....they've been at it for at least an hour.
Re: Construction Cam is Up!!!!!!!!
This time of year it's standard procedure. The days are short and they want to finish in day light so they can see their work.
Re: Construction Cam is Up!!!!!!!!
OK, that cinder block wall is getting to me. Who ever is directing this show, get out the directors chair and tell the camera operator to move. They have more actors than the white piping hanging from the wall......
1 Attachment(s)
Re: Construction Cam is Up!!!!!!!!
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
wcd35
So many pipes now
Those aren't pipes they are lightweight steel studs for the exterior wall.