Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Zeebart21
Lets hope its at the Tigue and not some other venue!
Z
That would be FAB-ulous.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
BeauCajun
That would be FAB-ulous.
yup
Re: Construction Cam is Up!!!!!!!!
Looks like the plumber getting ready to get busy this morning.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
HelmutVII
Looks like the plumber getting ready to get busy this morning.
---Helmut---what is going on in the photo? Is the foundation been done---what are the holes (rectangular) with the pipes for---will this be cemented in ???
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Boomer
---Helmut---what is going on in the photo? Is the foundation been done---what are the holes (rectangular) with the pipes for---will this be cemented in ???
I was thinking the pipes would be either electrical or plumbing.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Boomer
---Helmut---what is going on in the photo? Is the foundation been done---what are the holes (rectangular) with the pipes for---will this be cemented in ???
The holes are excavations for concrete footings. You can see the plastic caps on the end of all the rebar. The white pipe is pvc plumbing pipe. I would suspect that this area will be either concession stand or rest room. Keep in mind that since the camera is so close we are seeing only that area from home plate to first base. We are not seeing any activity that is happening along the third base line. I suspect that the structure will be steel or precast concrete. If precast concrete it will be like the new parking garages on campus. If that is the case then the structure will go up fairly quick once the foundation work is complete. The speed of erection will depend on how fast they can deliver the sections.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
weareLOUISIANA
From what ive seen it'll be amazing if we play a game in this stadium before May
Well yeah.
1 Attachment(s)
Re: Construction Cam is Up!!!!!!!!
Construction site is busy this morning. Hard hats are nice and shiny.
Re: Construction Cam is Up!!!!!!!!
I have one question. The third base bleachers are just a feet from the club house. Looking at the picture, where will the structure be behind it. Will the club house be torn down? Just don't see it.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
bmverret
I'm sure we will flip games with them.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
TheFan
I'm sure we will flip games with them.
How 'bout we play over there and let them pay back the trip during football season?
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Cajun90
There is no structure going behind third base bleachers. There will be the deck that goes over the clubhouse. Supports for the deck were accounted for including a couple that go through the clubhouse.
As an addendum, the clubhouse will be inaccessible until all construction work is completed. Until then, I would assume baseball will probably continue to work out of the Cox center.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
bmverret
This is the back end of the deal we put together last season. We picked up a midweek game with them over there in the middle of the season due to other lost games. Hopefully we get it in our park, but we'll see
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
weareLOUISIANA
The new structure is being built on top / around the clubhouse
Actually, unless things were changed we were told there will be structural support members for the new bleacher decks inside the current clubhouse structure.
Re: Construction Cam is Up!!!!!!!!
Re: Construction Cam is Up!!!!!!!!
141 days if the opener is a home game at the Tigue on Feb. 17th......about 4.5 months. They will have to put a crew in each one of those holes and don't let them out until their job is completed, (in those holes).
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
CajunAmos
As an addendum, the clubhouse will be inaccessible until all construction work is completed. Until then, I would assume baseball will probably continue to work out of the Cox center.
Good thing the Cox building hasn't been torn down yet, it's Scott Fubar's back up plan for everything!
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Frenchie35
141 days if the opener is a home game at the Tigue on Feb. 17th......about 4.5 months. They will have to put a crew in each one of those holes and don't let them out until their job is completed, (in those holes).
Comment straight from the jobsite, "This job wouldn't be past half complete if certain people wouldn't have drug their feet". We all know who those people are and it's nobody in the baseball program.
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
CajunAmos
As an addendum, the clubhouse will be inaccessible until all construction work is completed. Until then, I would assume baseball will probably continue to work out of the Cox center.
I am not totally sure, but it looked like the baseballers are using the old football training room for coaches offices and I am not sure about the rest!!!
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
cjr3888
Comment straight from the jobsite, "This job wouldn't be past half complete if certain people wouldn't have drug their feet". We all know who those people are and it's nobody in the baseball program.
So they should be over half complete by November?
Re: Construction Cam is Up!!!!!!!!
Quote:
Originally Posted by
Textitan
So they should be over half complete by November?
Too many variables. Weather, holidays etc. Come on, you know better than that. The fact remains, our ineptitude has put this project way behind.
Z