A from today.
building pad complete
https://c1.staticflickr.com/1/468/32...a196893e_k.jpg
Segmented block retaining wall was started yesterday. It will be a while on this.
https://c1.staticflickr.com/1/683/32...09bd0a90_k.jpg
How much of the range is being taken up and will cliff give lessons out of the facility?
Not much if any of the existing driving range will be used. A retaining wall is being built to capture space for the buildings. There will be three indoor driving stations 2 for UL the third is for Oakbourne Members. Don't know about lessons though.
Cool deal, I know cliff usually does lessons in that corner.
Getting ready for a concrete placement at 4:00 A.M. on Saturday Morning.
This is the practice building. It will have 3 bays and some storage rooms with a place to view video
https://c1.staticflickr.com/1/628/32...40ba4f78_n.jpg
This will be the view out of the hitting bay
https://c1.staticflickr.com/4/3954/3...ef2f6f3f_n.jpg
This will be a building for a locker room, coaches office and storage. There will also be a porch around three sides of the building for shelter from rain and sun.
https://c1.staticflickr.com/3/2578/3...7492be17_n.jpg
Making headway it looks like. Thanks HelmutVII