Work on the first Rose Garden dorm continues. Lots of below ground work this past week so it doesn't look too much different from last week.
First Rose Garden Dorm under construction. All three stairwells are finished along with the elevator pit. Lots of Plumbing and Electrical rough in being done. The photo does not show it very well but the foreground is about a three foot deep excavation where Bonin used to be. I guess they will fill it up this week. (photo taken from fire escape for Harris Hall)
<a href="http://www.flickr.com/photos/66590213@N05/6297139822/" title="first-dorm-use by Rosegardendorms, on Flickr"><img src="http://farm7.static.flickr.com/6104/6297139822_2d2b7a5d03.jpg" width="500" height="313" alt="first-dorm-use"></a>
Dirt work completed where Bonin used to be. (Photo taken from fire escape for Harris Hall)
<a href="http://www.flickr.com/photos/66590213@N05/6296608863/" title="dirt-work by Rosegardendorms, on Flickr"><img src="http://farm7.static.flickr.com/6107/6296608863_0ab399d15c.jpg" width="500" height="307" alt="dirt-work"></a>
Electric service for the first Rose Garden Dorm.
<a href="http://www.flickr.com/photos/66590213@N05/6296609263/" title="electrick-service by Rosegardendorms, on Flickr"><img src="http://farm7.static.flickr.com/6040/6296609263_b7da7122f9.jpg" width="500" height="296" alt="electrick-service"></a>
Electric and Plumbing rough in completed at this portion of the building. Preparing for concrete placement. Randolph Hall is to the rear of the camera.
<a href="http://www.flickr.com/photos/66590213@N05/6297140802/" title="getting-ready by Rosegardendorms, on Flickr"><img src="http://farm7.static.flickr.com/6232/6297140802_c56d66f592.jpg" width="500" height="386" alt="getting-ready"></a>