Brick work and other exterior work is finishing up. Looks like they got some precast concrete accent pieces in this week.
Huger Hall as seen from Taft street.
<a href="http://www.flickr.com/photos/64129854@N04/6136890685/" title="huger-taft by cpsengineering, on Flickr"><img src="http://farm7.static.flickr.com/6185/6136890685_3d21a20743.jpg" width="500" height="345" alt="huger-taft"></a>
North facade of Huger Hall. Hamilton hall is to the left. Half of this side was bricked last week,
<a href="http://www.flickr.com/photos/64129854@N04/6137433864/" title="huger-baker-1 by cpsengineering, on Flickr"><img src="http://farm7.static.flickr.com/6155/6137433864_86d54b6fef.jpg" width="476" height="500" alt="huger-baker-1"></a>
Installing soffit and facia on Tulane Avenue Facade
<a href="http://www.flickr.com/photos/64129854@N04/6136889255/" title="soffit-facia by cpsengineering, on Flickr"><img src="http://farm7.static.flickr.com/6192/6136889255_1a9edf4590.jpg" width="432" height="500" alt="soffit-facia"></a>
Literally a ton of copper went into this building. I don't think they are finished yet. Because copper is so expensive, empty spools are the only spools they leave out like this.
<a href="http://www.flickr.com/photos/64129854@N04/6137434382/" title="copper-spools by cpsengineering, on Flickr"><img src="http://farm7.static.flickr.com/6207/6137434382_d76b6944fe.jpg" width="500" height="340" alt="copper-spools"></a>