Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
dms4720
i just noticed this, and it probably doesnt need it because it is only two stories i believe, but there are no elevators. atleast i didnt see any shafts erected.
It looks to me like they are leaving space for an elevator in the lobby area, which is where you would think it would go.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
cajuns_fan
It looks to me like they are leaving space for an elevator in the lobby area, which is where you would think it would go.
You are correct. You need to look fast because you probably won't be able to see it much longer. I would suspect the lobby area got smaller than what was originally shown in the mater plan. My first impression when I saw that was it was a tremendous waste of space.. Glad to see they got more efficient in the space planning.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
HelmutVII
You are correct. You need to look fast because you probably won't be able to see it much longer. I would suspect the lobby area got smaller than what was originally shown in the mater plan. My first impression when I saw that was it was a tremendous waste of space.. Glad to see they got more efficient in the space planning.
Yeah, but you know, I find it very hard to keep the scale of this building in mind when looking at it: it is so much bigger than it appears! at least to me. Like, when I was first trying to figure out if it really was a complete 2nd floor....when you see a person standing in it, it could almost be 3 stories, lol. Same thing with the lobby: when you see a person....or a big crane in it....you realize that it is still a very big space. just my .02 anyway.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
HelmutVII
I think I would forget about the floor plan shown on the master plan. I am sure the plan was further developed during the design stage. It looks like the locker/dressing room will be adjacent to Cajun Field (why would they have it any place else). Notice all of the roughed in plumbing at that end of the building.
I don't know....I'm no expert, but the plumbing fixtures look more like urinals/stalls than showers. I think it looks more like bathrooms than locker rooms, IMHO.
Re: Construction Cam APC ( Athletic Performance Complex )
I see an angled beam running along the end of the red steel, as of now. Could the film room be constructed there with bathrooms being under neath it?
Re: Construction Cam APC ( Athletic Performance Complex )
And it also seems that the lobby will not be two stories tall, as it looks like they are putting in the crossbar/re-bars in that section.
Re: Construction Cam APC ( Athletic Performance Complex )
My hope is that they put enough rooms to accommodate all peoples and DESTROY that COX building and build my dam APC Quad!!!!!!!!!!!!!!!!!!
"You can do it................."
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
Fais do-do
My hope is that they put enough rooms to accommodate all peoples and DESTROY that COX building and build my dam APC Quad!!!!!!!!!!!!!!!!!!
"You can do it................."
Me too....I guess that's one of the main reasons why I am so curious to see floor plans...it would be very interesting to know who/what is going in that section. The answer to that question could lead to a whole bunch of different scenarios. Or not, lol.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
cajuns_fan
I don't know....I'm no expert, but the plumbing fixtures look more like urinals/stalls than showers. I think it looks more like bathrooms than locker rooms, IMHO.
There is probably a visitors and home team locker room on this end of the building. They will have rest room facilities in each one. I doubt if the would put the visitors or home team locker room any other place than adjacent to the stadium/practice facilities just to be in close proximity to where they are needed. There were other types of plumbing installation on the other side of the building next to the large auditorium/meeting room. I'm thinking tht will be for athletes in other sports to come in, dress out and work out or get training.
Re: Construction Cam APC ( Athletic Performance Complex )
Quote:
Originally Posted by
cajuns_fan
It looks to me like they are leaving space for an elevator in the lobby area, which is where you would think it would go.
If you look now you will see a rectangular and a square opening in the bar joist framing. The rectangular opening is probably for a stair way and the square opening is for the elevator. The bar joist are being set now and if the locker room framing doesn't block it you will be able to clearly see them once the place the steel decking over the bar joists.