Demolition of Huger, Baker, Bonin and Evangeline should start in earnest next week. Griffin would not have moved two large pieces of equipment on site just to let them sit.
<a href="http://www.flickr.com/photos/58014429@N07/5822361441/" title="huger-baker-bonin by ddnaomi, on Flickr"><img src="http://farm6.static.flickr.com/5302/5822361441_6a6e43f57c.jpg" width="500" height="193" alt="huger-baker-bonin"></a>
Evangeline hall soon to be renovated.
<a href="http://www.flickr.com/photos/58014429@N07/5822361735/" title="evangeline by ddnaomi, on Flickr"><img src="http://farm4.static.flickr.com/3359/5822361735_31865819da.jpg" width="500" height="345" alt="evangeline"></a>
Truss joist for new Huger Hall stored on Boucher Street near old Huger hall.
<a href="http://www.flickr.com/photos/58014429@N07/5822362631/" title="huger-joists2 by ddnaomi, on Flickr"><img src="http://farm4.static.flickr.com/3231/5822362631_df75b890fe.jpg" width="500" height="335" alt="huger-joists2"></a>
New Baker Hall on June 11, 2011
<a href="http://www.flickr.com/photos/58014429@N07/5822926800/" title="baker-6-11-11 by ddnaomi, on Flickr"><img src="http://farm4.static.flickr.com/3574/5822926800_377cff6ba0.jpg" width="500" height="181" alt="baker-6-11-11"></a>
Arches on new Baker Hall, similar to arches on many of the older buildings on campus.
<a href="http://www.flickr.com/photos/58014429@N07/5822362111/" title="baker-arches by ddnaomi, on Flickr"><img src="http://farm6.static.flickr.com/5029/5822362111_6aa2a20d98.jpg" width="443" height="500" alt="baker-arches"></a>
New Baker on left, Hamilton to the rear and middle and New Huger (I assume) on right.
<a href="http://www.flickr.com/photos/58014429@N07/5822926458/" title="baker-huger-hamilton by ddnaomi, on Flickr"><img src="http://farm4.static.flickr.com/3657/5822926458_b73acb2405.jpg" width="500" height="306" alt="baker-huger-hamilton"></a>
Parking garage on June 11, 2011
<a href="http://www.flickr.com/photos/58014429@N07/5822362397/" title="garage-6-11-11 by ddnaomi, on Flickr"><img src="http://farm6.static.flickr.com/5116/5822362397_f6f4558eca.jpg" width="500" height="374" alt="garage-6-11-11"></a>
Mc Kinley street facade on June 11, 2011. The guys in the lift are placing high performance caulking in the joints between the precast panels.
<a href="http://www.flickr.com/photos/58014429@N07/5822925884/" title="garage-facade by ddnaomi, on Flickr"><img src="http://farm3.static.flickr.com/2413/5822925884_464fd209fa.jpg" width="291" height="500" alt="garage-facade"></a>
This is exciting.
Thanks for the weekend update.
I found out today that D-Day for completion of new Baker and the Parking Garage is August 11. It aught to be interesting to see if they make it.
Asbestos removal continues at Old Baker, Huger, Bonin and Evangeline so not too much to see there. I am assuming the second dorm being built behind Hamilton is New Huger hall I will call it that until I know otherwise. These are some photos of that building
Hamilton Hall is on the right with the parking garage in the middle and to the rear
<a href="http://www.flickr.com/photos/64129854@N04/5847395254/" title="huger1 by cpsengineering, on Flickr"><img src="http://farm6.static.flickr.com/5189/5847395254_bbfc815098.jpg" width="500" height="311" alt="huger1"></a>
New Huger hall at the corner of Tulane and Taft
<a href="http://www.flickr.com/photos/64129854@N04/5847395464/" title="huger2 by cpsengineering, on Flickr"><img src="http://farm3.static.flickr.com/2441/5847395464_0b0e1f6d63.jpg" width="500" height="263" alt="huger2"></a>
New Baker on the left Hamilton to the rear and middle and new Huger on the right. The brick work on New Baker is almost finished. I saw about 6 airless paint sprayers either finished or ready to go and there were some ceiling fans installed on the fourth floor.
<a href="http://www.flickr.com/photos/64129854@N04/5846836591/" title="baker-ham-huger by cpsengineering, on Flickr"><img src="http://farm4.static.flickr.com/3264/5846836591_8624ce0f85.jpg" width="500" height="340" alt="baker-ham-huger"></a>
New Baker hall on 6-18-11. A precast double "T" floor slab section is being delivered for the parking garage. Less and less material and storage units on this part of the site. They are starting to complete the drainage culverts and inlets. You can really see the difference between the cleaned and uncleaned brick work.
<a href="http://www.flickr.com/photos/64129854@N04/5846852079/" title="baker6-18-11 by cpsengineering, on Flickr"><img src="http://farm6.static.flickr.com/5275/5846852079_12bc7b107a.jpg" width="500" height="306" alt="baker6-18-11"></a>
Cleaning the brick veneer. Note the arches at the entrance. They will be placing concrete for the entry porch soon and then placing decorative columns around the steel in the foreground. The decorative columns are stored on site.
<a href="http://www.flickr.com/photos/64129854@N04/5847396188/" title="brick-cleaning by cpsengineering, on Flickr"><img src="http://farm3.static.flickr.com/2537/5847396188_849c638d90.jpg" width="500" height="402" alt="brick-cleaning"></a>
Parking garage on 6-18-11
<a href="http://www.flickr.com/photos/64129854@N04/5846836795/" title="garage-6-18-11 by cpsengineering, on Flickr"><img src="http://farm6.static.flickr.com/5231/5846836795_81c5a04aed.jpg" width="500" height="321" alt="garage-6-18-11"></a>
Ready to lift a precast double "T" section.
<a href="http://www.flickr.com/photos/64129854@N04/5846837197/" title="ready-to-lift by cpsengineering, on Flickr"><img src="http://farm4.static.flickr.com/3228/5846837197_b0b2fe6833.jpg" width="500" height="351" alt="ready-to-lift"></a>
Flying it into place. Note the guy on the ground with a tag line. Good thing it wasn't too windy today.
<a href="http://www.flickr.com/photos/64129854@N04/5847396632/" title="flying by cpsengineering, on Flickr"><img src="http://farm3.static.flickr.com/2803/5847396632_af6cf0957a.jpg" width="500" height="348" alt="flying"></a>
Almost there and ready to catch.
<a href="http://www.flickr.com/photos/64129854@N04/5847396774/" title="catch by cpsengineering, on Flickr"><img src="http://farm3.static.flickr.com/2704/5847396774_00d0c06d3c.jpg" width="500" height="282" alt="catch"></a>
Muscling the section into place. Safety inspector must be off today, he doesn't have his yellow vest on.
<a href="http://www.flickr.com/photos/64129854@N04/5847396832/" title="muscle by cpsengineering, on Flickr"><img src="http://farm3.static.flickr.com/2643/5847396832_6958e40637.jpg" width="500" height="375" alt="muscle"></a>
There it is.
<a href="http://www.flickr.com/photos/64129854@N04/5847396962/" title="done by cpsengineering, on Flickr"><img src="http://farm6.static.flickr.com/5024/5847396962_2491d782dd.jpg" width="500" height="291" alt="done"></a>
They will be building out the middle section and the west section together because the crane won't have enough room to swing.