Originally Posted by
HelmutVII
Since Baker Hall is finished this will be the final before and after of Baker Hall.
January 2, 2011
<a href="http://www.flickr.com/photos/58014429@N07/5334464222/" title="demo-1 by ddnaomi, on Flickr"><img src="http://farm6.static.flickr.com/5163/5334464222_4f6df8efa9.jpg" width="500" height="193" alt="demo-1"></a>
August 13, 2011, Finis.
<a href="http://www.flickr.com/photos/64129854@N04/6039824160/" title="baker-finis by cpsengineering, on Flickr"><img src="http://farm7.static.flickr.com/6078/6039824160_88b17327f0.jpg" width="500" height="264" alt="baker-finis"></a>
The only thing they have left to do is to install lights along the sidewalk along the front and side of the building.