Re: Parking Garage Construction
My favorite part of the 20 something pages.....May 2014 is coming up pretty fast....
Are they almost completed?
Re: Parking Garage Construction
Quote:
Originally Posted by
Fais do-do
My favorite part of the 20 something pages.....May 2014 is coming up pretty fast....
Are they almost completed?
I wish they would have done a 6 level building fronting Lewis, that way they could have used it for academics and made the garage look like an academic building instead of a garage.
Re: Parking Garage Construction
Quote:
2) The portion of the building facing Lewis Street will be an Engineering Lab that will require equipment that is greater than one story in height.
That explains it.....thanks
Re: Parking Garage Construction
Quote:
Originally Posted by
ULGrad@HOU
I read somewhere that the entrance to the garage will be from Girard Park Cir and not from E Lewis st. Not sure if this correlates to the pic.
In Post #31, Nov 20th, 2013. I knew I had seen it written somewhere, I couldn't remember where. It may have been the request for approval, or an article in The Advertiser. Glad to see the confirmation, so I wasn't dreaming it. Now I can sleep at night.
Re: Parking Garage Construction
Quote:
Originally Posted by
cajuns_fan
Lol....I know it's crazy, but where the access would be located was vexing me!
I guess the main reason for that is that I very much like the plan to build the other two buildings that would flank Oliver, and then build another quad area. I know, this may be a long time off, but in my mind the parking tower access jeopardizes this....but maybe I am wrong about that?
I think it will look okay. I'm sure they'll nudge the access up close to Fletcher Hall and it won't be that noticeable.
Re: Parking Garage Construction
Quote:
Originally Posted by
CajunRebel
I think it will look okay. I'm sure they'll nudge the access up close to Fletcher Hall and it won't be that noticeable.
Access will be about where the job access point is now. Fairly close to Fletcher hall. It was a second drive into the parking lot was placed on the old McNaspy field.
Re: Parking Garage Construction
Are they almost finished?
End of May is in 9 days! They should be wrapping up!
What about the rest of the campus? With all the Regionals going on, I miss my construction updates.....
Z, Boomer, Hammer, Hawk, Helmet ??
Re: Parking Garage Construction
Quote:
Originally Posted by
Fais do-do
Are they almost finished?
End of May is in 9 days! They should be wrapping up!
What about the rest of the campus? With all the Regionals going on, I miss my construction updates.....
Z, Boomer, Hammer, Hawk, Helmet ??
I live nearby, and drove by yesterday......not much change. But i will do it again tomorrow or Saturday and will postpone pics.
6 Attachment(s)
Re: Parking Garage Construction
Some pics from this morning. Really difficult to get a good pic from the ground, but I am also posting some (really cool) aerial shots that were posted on the Fletcher Hall FaceBook page
1 Attachment(s)
Re: Parking Garage Construction
And it looks like they are progressing in demolishing Stokes A&B: the whole area is now fenced-off, and they have emptied out the interior contents (mattresses, etc).
Re: Parking Garage Construction
Quote:
Originally Posted by
cajuns_fan
And it looks like they are progressing in demolishing Stokes A&B: the whole area is now fenced-off, and they have emptied out the interior contents (mattresses, etc).
NOOOOO!!!!!!!!!
http://4.bp.blogspot.com/-cleREvd5be...out-liquor.gif
Just kidding. this thing needed to be imploded a LONG time ago, but after Voorhies and McCollogh were imploded Stokes was all we had for male dorms (outside of conference center)
Re: Parking Garage Construction
I remember being in stokes b was one of the best when I was at usl and quiet but jail cells are probably bigger nowdays